Inspections for the day of: Tuesday, August 27, 2002.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-02539 Plumbing Rough-in8/26/20028/27/20028/27/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/26/2002 at 08:51:57. Contact: ###-####.
PLM02-01247 Final8/26/20028/27/20028/27/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/26/2002 at 10:30:20. Contact: ###-####. whirlpool access, needs heat to garage to protect water heater and softenor from freezing as agreed at r/i. 8/27/2002 10:58:45 AM
PLM02-02625 Sprinkler (Final)8/26/20028/27/20028/27/2002 12:00:00 AMAPART
chad ###-#### tie in ok 8/27/2002 10:09:47 AM
PLM02-02626 Sprinkler (Final)8/26/20028/27/20028/27/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/26/2002 at 12:20:00. Contact: ###-####.
PLM02-02627 Sprinkler (Final)8/26/20028/27/20028/27/2002 12:00:00 AMAFAIL
###-#### ###-#### offset in sewer to be made with fittings, remove piping from trench, provide a firm bed, reinstall, repair leak in sewer at coupling, retest, call for reinspection. 8/27/2002 11:15:43 AM
PLM02-00906 Storm Drains8/26/20028/27/20028/27/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/26/2002 at 13:31:01. Contact: ###-####. partial rd rotunda, s.e. side. also put a double fee on percission pipeline for work done on the utilities without permit or inspection. 8/27/2002 9:04:00 AM
PLM02-02170 Water and/or Sewer8/26/20028/27/20028/27/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/26/2002 at 14:28:12. Contact: ###-####. sewer ok 8/27/2002 9:14:04 AM
PLM02-02218 Final8/26/20028/27/20028/27/2002 12:00:00 AMANR
ken; Phone #: ###-####
PLM02-02631 Groundwork8/26/20028/27/20028/27/2002 12:00:00 AMAPASS
after 11:00 please\\###-#### or ###-####
PLM02-02218 Plumbing Rough-in8/27/20028/27/20028/27/2002 12:00:00 AMAPASS
ri ok
PLM02-02631 Plumbing Rough-in8/27/20028/27/20028/27/2002 12:00:00 AMAPASS
ri gw ok
PLM02-02625 Sprinkler (Final)8/27/20028/27/20028/27/2002 12:00:00 AMPPASS
PLM02-02642 Sprinkler (Final)8/27/20028/27/20028/27/2002 12:00:00 AMPPART
###-#### CHAD tie in ok needs test 8/27/2002 3:27:16 PM 8/27/2002 3:27:50 PM
PLM02-02643 Sprinkler (Final)8/27/20028/27/20028/27/2002 12:00:00 AMPPART
###-#### CHAD tie in ok needs test 8/27/2002 3:27:26 PM
PLM02-02644 Sprinkler (Final)8/27/20028/27/20028/27/2002 12:00:00 AMPPART
###-#### CHAD tie in ok needs test 8/27/2002 3:27:40 PM
PLM02-02636 Water and/or Sewer8/27/20028/27/20028/27/2002 12:00:00 AMPPART
###-#### water lines ok sewer needs more time will recall 8/27/2002 2:29:50 PM
PLM02-00906 Water and/or Sewer8/27/20028/27/20028/27/2002 12:00:00 AMPPART
meeting with Laton about utilities, will set up a meeting with ken snider for clairifacation 8/27/2002 2:01:08 PM
PLM02-02637 Water and/or Sewer8/27/20028/27/20028/27/2002 12:00:00 AMPPASS
###-#### LAMOND
PLM02-01843 Final8/27/20028/27/20028/27/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/27/2002 at 09:22:33. Contact: ###-####. needs a sprinkler permit prior to final, connection to water service was done at the s/w stage 8/27/2002 3:13:53 PM
PLM02-02263 Plumbing Rough-in8/27/20028/27/20028/27/2002 12:00:00 AMPPASS
###-#### LEE this is an addition, the requirement for backwater valves is for new construction per boise city plumbing code inforcement practices, ri ok 8/27/2002 2:36:52 PM