PLM02-02539
| Plumbing Rough-in | 8/26/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 08:51:57. Contact: ###-####.
|
PLM02-01247
| Final | 8/26/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 10:30:20. Contact: ###-####. whirlpool access, needs heat to garage to protect water heater and softenor from freezing as agreed at r/i. 8/27/2002 10:58:45 AM
|
PLM02-02625
| Sprinkler (Final) | 8/26/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | A | PART |
|
|
chad ###-#### tie in ok 8/27/2002 10:09:47 AM
|
PLM02-02626
| Sprinkler (Final) | 8/26/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 12:20:00. Contact: ###-####.
|
PLM02-02627
| Sprinkler (Final) | 8/26/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | A | FAIL |
|
|
###-#### ###-#### offset in sewer to be made with fittings, remove piping from trench, provide a firm bed, reinstall, repair leak in sewer at coupling, retest, call for reinspection. 8/27/2002 11:15:43 AM
|
PLM02-00906
| Storm Drains | 8/26/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 13:31:01. Contact: ###-####. partial rd rotunda, s.e. side. also put a double fee on percission pipeline for work done on the utilities without permit or inspection. 8/27/2002 9:04:00 AM
|
PLM02-02170
| Water and/or Sewer | 8/26/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/26/2002 at 14:28:12. Contact: ###-####. sewer ok 8/27/2002 9:14:04 AM
|
PLM02-02218
| Final | 8/26/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | A | NR |
|
|
ken; Phone #: ###-####
|
PLM02-02631
| Groundwork | 8/26/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | A | PASS |
|
|
after 11:00 please\\###-#### or ###-####
|
PLM02-02218
| Plumbing Rough-in | 8/27/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | A | PASS |
|
|
ri ok
|
PLM02-02631
| Plumbing Rough-in | 8/27/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | A | PASS |
|
|
ri gw ok
|
PLM02-02625
| Sprinkler (Final) | 8/27/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | P | PASS |
|
|
|
PLM02-02642
| Sprinkler (Final) | 8/27/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | P | PART |
|
|
###-#### CHAD tie in ok needs test 8/27/2002 3:27:16 PM 8/27/2002 3:27:50 PM
|
PLM02-02643
| Sprinkler (Final) | 8/27/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | P | PART |
|
|
###-#### CHAD tie in ok needs test 8/27/2002 3:27:26 PM
|
PLM02-02644
| Sprinkler (Final) | 8/27/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | P | PART |
|
|
###-#### CHAD tie in ok needs test 8/27/2002 3:27:40 PM
|
PLM02-02636
| Water and/or Sewer | 8/27/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | P | PART |
|
|
###-#### water lines ok sewer needs more time will recall 8/27/2002 2:29:50 PM
|
PLM02-00906
| Water and/or Sewer | 8/27/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | P | PART |
|
|
meeting with Laton about utilities, will set up a meeting with ken snider for clairifacation 8/27/2002 2:01:08 PM
|
PLM02-02637
| Water and/or Sewer | 8/27/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | P | PASS |
|
|
###-#### LAMOND
|
PLM02-01843
| Final | 8/27/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/27/2002 at 09:22:33. Contact: ###-####. needs a sprinkler permit prior to final, connection to water service was done at the s/w stage 8/27/2002 3:13:53 PM
|
PLM02-02263
| Plumbing Rough-in | 8/27/2002 | 8/27/2002 | 8/27/2002 12:00:00 AM | P | PASS |
|
|
###-#### LEE this is an addition, the requirement for backwater valves is for new construction per boise city plumbing code inforcement practices, ri ok 8/27/2002 2:36:52 PM
|