Inspections for the day of: Tuesday, August 27, 2002.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01501 BLD-Final8/21/20028/27/20028/27/2002 12:00:00 AMAPASS
DENISE ###-####
BLD02-00972 BLD-Final8/26/20028/27/20028/27/2002 12:00:00 AMAPASS
###-#### entry code 193
BLD02-00972 BLD-Final8/26/20028/27/20028/27/2002 12:00:00 AMAPASS
###-#### entry code 193
BLD02-01687 BLD-Framing/Rough-in8/26/20028/27/20028/27/2002 12:00:00 AMAFAIL
meet with framer c/n posted. 8/27/2002 12:39:16 PM
BLD02-00972 BLD-Final8/26/20028/27/20028/27/2002 12:00:00 AMAPASS
###-#### entry code 193
BLD02-00972 BLD-Final8/26/20028/27/20028/27/2002 12:00:00 AMAPASS
###-#### entry code 193
BLD01-01961 BLD-Final8/21/20028/27/20028/27/2002 12:00:00 AMPFAIL
###-#### denise will need to meet with contractor again to resolve firewall issue, talked with home owner about this and they will call con 8/27/2002 12:52:56 PM tractor. 8/27/2002 12:53:01 PM
MEC02-02373 Final8/27/20028/27/20028/27/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/27/2002 at 08:28:05. Contact: .
BLD02-00945 BLD-Final8/27/20028/27/20028/27/2002 12:00:00 AMPPASS
###-#### garage code 3615enter
MEC02-02373 Pressure Test8/27/20028/27/20028/27/2002 12:00:00 AMPPASS
###-#### KEN
BLD02-01028 BLD-Other8/27/20028/27/20028/27/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/27/2002 at 09:20:57. Contact: ###-####.dumpster. Also talked with framer and advised to wait for the engineers revisions before performing any repairs. 8/27/2002 1:50:30 PM
BLD02-01832 BLD-Foundation8/27/20028/27/20028/27/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/27/2002 at 09:25:28. Contact: ###-####.