Inspections for the day of: Friday, August 27, 2004.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR03-00690 INSP-Conference8/26/20048/27/20048/27/2004 12:00:00 AMAPART
cliff; Phone #: ###-#### Internet Inspection Request from: Annette Moore Met with Cliff about testing the system; will need to verify smoke detectors on wall in room; need to verify wire size/calc's for NAC's prior to testing 8/27/2004 11:03:16 AM
BLD04-01338 FIRE-Final Inspection8/26/20048/27/20048/27/2004 12:00:00 AMAPART
###-#### - richard Phase I okay to occupy 8/27/2004 4:05:43 PM
BLD04-00919 FIRE-Final Inspection8/26/20048/27/20048/27/2004 12:00:00 AMAPASS
9:30
BLD03-02057 FIRE-Final Inspection8/27/20048/27/20048/27/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 8/27/2004 at 8:30:47 AM. Contact: ###-####. See fire alarm permit 8/27/2004 4:16:25 PM
BLD03-02058 FIRE-Final Inspection8/27/20048/27/20048/27/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 8/27/2004 at 8:32:56 AM. Contact: ###-####. Need access door for damper in corridor; add exit sign on 2nd floor; install knox box; see sprinkler and alarm permits for other info 8/27/2004 4:16:03 PM
BLD04-01466 FIRE-Final Inspection8/27/20048/27/20048/27/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 8/27/2004 at 8:37:27 AM. Contact: ###-####.
FIR04-00174 INSP-Final Inspection8/27/20048/27/20048/27/2004 12:00:00 AMPFAIL
Your contact is Mike Bierman at ###-####; Phone #: ###-#### Internet Inspection Request from: Trent Bice Need clac sticker 8/27/2004 4:10:53 PM
FIR04-00424 INSP-Final Inspection8/27/20048/27/20048/27/2004 12:00:00 AMPPART
Phase I okay; NAC's operated in Phase I area okay; will need to test this circuit EOL voltage at final 8/27/2004 4:05:24 PM
FIR03-00814 INSP-Final Inspection8/27/20048/27/20048/27/2004 12:00:00 AMPPASS
UG completed 8/27/2004 4:06:48 PM
FIR04-00412 INSP-Final Inspection8/27/20048/27/20048/27/2004 12:00:00 AMPFAIL
LEd not working on AHU 5 detector; need updated maps to reflect changes; resubmittals needed due to initiating circuit changes; monitor elevator power as shown on plans 8/27/2004 4:09:47 PM
FIR04-00413 INSP-Final Inspection8/27/20048/27/20048/27/2004 12:00:00 AMPFAIL
Plans don't install - initiating devices don't match; update maps; resubmit plan mod's; monitor elevator power as shown on plans; need lockout on sprinkler bell breaker; need sign on FACP door; install knox box 8/27/2004 4:13:54 PM
FIR04-00418 INSP-Final Inspection8/25/20048/27/20048/27/2004 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 8/25/2004 at 8:28:26 AM. Contact: ###-####. Previously completed 8/27/2004 1:08:49 PM