BLD07-01846
| BLD-Framing/Rough-in | 8/27/2008 | 8/27/2008 | 8/27/2008 5:18:42 PM | P | PART |
|
|
John Phone #: ###-####. Trusses for new parapet on existing roof.
|
BLD08-01799
| BLD-Final | 8/27/2008 | 8/27/2008 | 8/27/2008 3:17:37 PM | P | PASS |
|
|
Tom Phone #: ###-####. ok for perm occ.
|
BLD08-01790
| BLD-Conference | 8/27/2008 | 8/27/2008 | 8/27/2008 1:45:38 PM | P | PASS |
|
|
Chad-Please call 30 mins prior to inspection Phone #: ###-####
|
BLD07-02644
| BLD-Footing | 8/27/2008 | 8/27/2008 | 8/27/2008 1:21:57 PM | P | PART |
|
|
Phone #: ###-####. wip on installing reinforcement. Called contractor to have him contact a Geotech engineer to verify the min. 2000 psf soil bearing for footings. Will reschedule additional insp. for the am.
|
ESC07-01278
| Tracking Control | 8/27/2008 | 8/27/2008 | 8/27/2008 1:20:08 PM | P | PASS |
|
|
New controlled entry point in place. ok. ESC permit sign posted, BMP's ok.
|
ESC08-00464
| BMP Violation | 8/27/2008 | 8/27/2008 | 8/27/2008 12:38:11 PM | P | CANC |
|
|
|
BLD08-01613
| BLD-Final | 8/26/2008 | 8/27/2008 | 8/27/2008 12:36:14 PM | A | DONE |
|
|
Doug ###-####
|
BLD08-01613
| DOC - Permit Finaled | 8/27/2008 | 8/27/2008 | 8/27/2008 12:36:04 PM | P | PASS |
|
|
|
BLD08-01784
| BLD-Final | 8/26/2008 | 8/27/2008 | 8/27/2008 12:35:23 PM | A | PASS |
|
|
Shawn Brownlee ###-####
|
BLD08-01784
| DOC - Permit Finaled | 8/27/2008 | 8/27/2008 | 8/27/2008 12:35:14 PM | P | PASS |
|
|
All debris have been removed. Site is clean.
|
BLD08-01127
| BLD-Framing/Rough-in | 8/26/2008 | 8/27/2008 | 8/27/2008 10:35:52 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 8/26/2008 at 5:46:11 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Aug 27 2008 10:35AM.
|
ESC08-00208
| Site Preparation | 8/20/2008 | 8/27/2008 | 8/27/2008 9:45:33 AM | A | PASS |
|
|
|
BLD08-00984
| BLD-Final | 8/26/2008 | 8/27/2008 | 8/27/2008 9:45:20 AM | A | PASS |
|
|
Mike Please call 1/2 hr before going out ( ele final is also in for the am) Phone #: ###-####. ok for perm occ.
|