Inspections for the day of: Wednesday, August 27, 2008.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00563 General Inspection8/27/20088/27/20089/3/2008 10:15:56 AM PASS
ESC06-00324 Aging Inspection8/27/20088/27/20089/2/2008 3:14:01 PM DEFR
Moved to a site final.
CAS
ESC06-00255 Aging Inspection8/27/20088/27/20089/2/2008 2:52:03 PM DEFR
Moved to a site final.
CAS
ESC06-00307 Aging Inspection8/27/20088/27/20088/28/2008 9:58:56 AM DEFR
Moved to a site final.
CAS
ESC06-00327 Aging Inspection8/27/20088/27/20088/28/2008 9:57:44 AM DEFR
Moved to a site final.
ESC06-00326 Aging Inspection8/27/20088/27/20088/28/2008 9:49:23 AM DEFR
Moved to a site final.
ESC08-00508 BMP Violation8/19/20088/27/20088/27/2008 3:32:04 PMAPASS
No issues.
ESC08-00438 General Inspection8/27/20088/27/20088/27/2008 2:54:41 PM PASS
ESC08-00510 General Inspection8/27/20088/27/20088/27/2008 2:36:17 PM PASS
ESC08-00517 Site Final8/26/20088/27/20088/27/2008 2:16:33 PMACANC
korry Phone #: ###-####
ESC08-00692 Site Final8/26/20088/27/20088/27/2008 2:15:09 PMAPASS
ESC08-00714 General Inspection8/27/20088/27/20088/27/2008 2:08:45 PM NR
Not ready. Work has not begun.
CAS
ESC08-00715 General Inspection8/27/20088/27/20088/27/2008 11:30:37 AM NR
Work has not begun.
CAS
ESC07-01264 BMP Violation8/22/20088/27/20088/27/2008 9:34:20 AMAFAIL
Notice of Correction.
1. Install sediment protection in the back of the project where the stock pile of dirt is along the road way.
2. Remove all sediment and debris from all hard surface in the back part of the project area.
3. Maintain D.I. throughout the project area.
Failure to complt with the notice will result in a Stop Work Order.
Must be corrected by 8/28/08 PM. Will re-inspect on 7/1/08
CAS
ESC08-00617 General Inspection8/27/20088/27/20088/27/2008 9:22:36 AM NR
No work has begun.
ESC07-00071 Random Inspection8/27/20088/27/20088/27/2008 8:58:26 AMAFAIL
Need to clean up tracking off of the entrance into the project. Need to provide a concrete washout pit. Also use an alternate drain inlet protect that is above ground than an inside inlet protection. Will re-inspect on 8/29/08
CAS
ESC06-01855 Site Final8/13/20088/27/20088/27/2008 8:30:16 AMAFAIL
No landscapining on the front or the side of the building. Must stabilize all disturbed soil to reach an approval for a site final.
CAS
ESC07-01547 General Inspection8/21/20088/27/20088/27/2008 8:18:48 AMADEFR
Moved to 8/29/08.
CAS
ESC08-00672 General Inspection8/27/20088/27/20088/27/2008 8:15:20 AM NR
No work has commenced.
CAS