ESC08-00563
| General Inspection | 8/27/2008 | 8/27/2008 | 9/3/2008 10:15:56 AM | | PASS |
|
|
|
ESC06-00324
| Aging Inspection | 8/27/2008 | 8/27/2008 | 9/2/2008 3:14:01 PM | | DEFR |
|
|
Moved to a site final. CAS
|
ESC06-00255
| Aging Inspection | 8/27/2008 | 8/27/2008 | 9/2/2008 2:52:03 PM | | DEFR |
|
|
Moved to a site final. CAS
|
ESC06-00307
| Aging Inspection | 8/27/2008 | 8/27/2008 | 8/28/2008 9:58:56 AM | | DEFR |
|
|
Moved to a site final. CAS
|
ESC06-00327
| Aging Inspection | 8/27/2008 | 8/27/2008 | 8/28/2008 9:57:44 AM | | DEFR |
|
|
Moved to a site final.
|
ESC06-00326
| Aging Inspection | 8/27/2008 | 8/27/2008 | 8/28/2008 9:49:23 AM | | DEFR |
|
|
Moved to a site final.
|
ESC08-00508
| BMP Violation | 8/19/2008 | 8/27/2008 | 8/27/2008 3:32:04 PM | A | PASS |
|
|
No issues.
|
ESC08-00438
| General Inspection | 8/27/2008 | 8/27/2008 | 8/27/2008 2:54:41 PM | | PASS |
|
|
|
ESC08-00510
| General Inspection | 8/27/2008 | 8/27/2008 | 8/27/2008 2:36:17 PM | | PASS |
|
|
|
ESC08-00517
| Site Final | 8/26/2008 | 8/27/2008 | 8/27/2008 2:16:33 PM | A | CANC |
|
|
korry Phone #: ###-####
|
ESC08-00692
| Site Final | 8/26/2008 | 8/27/2008 | 8/27/2008 2:15:09 PM | A | PASS |
|
|
|
ESC08-00714
| General Inspection | 8/27/2008 | 8/27/2008 | 8/27/2008 2:08:45 PM | | NR |
|
|
Not ready. Work has not begun. CAS
|
ESC08-00715
| General Inspection | 8/27/2008 | 8/27/2008 | 8/27/2008 11:30:37 AM | | NR |
|
|
Work has not begun. CAS
|
ESC07-01264
| BMP Violation | 8/22/2008 | 8/27/2008 | 8/27/2008 9:34:20 AM | A | FAIL |
|
|
Notice of Correction. 1. Install sediment protection in the back of the project where the stock pile of dirt is along the road way. 2. Remove all sediment and debris from all hard surface in the back part of the project area. 3. Maintain D.I. throughout the project area. Failure to complt with the notice will result in a Stop Work Order. Must be corrected by 8/28/08 PM. Will re-inspect on 7/1/08 CAS
|
ESC08-00617
| General Inspection | 8/27/2008 | 8/27/2008 | 8/27/2008 9:22:36 AM | | NR |
|
|
No work has begun.
|
ESC07-00071
| Random Inspection | 8/27/2008 | 8/27/2008 | 8/27/2008 8:58:26 AM | A | FAIL |
|
|
Need to clean up tracking off of the entrance into the project. Need to provide a concrete washout pit. Also use an alternate drain inlet protect that is above ground than an inside inlet protection. Will re-inspect on 8/29/08 CAS
|
ESC06-01855
| Site Final | 8/13/2008 | 8/27/2008 | 8/27/2008 8:30:16 AM | A | FAIL |
|
|
No landscapining on the front or the side of the building. Must stabilize all disturbed soil to reach an approval for a site final. CAS
|
ESC07-01547
| General Inspection | 8/21/2008 | 8/27/2008 | 8/27/2008 8:18:48 AM | A | DEFR |
|
|
Moved to 8/29/08. CAS
|
ESC08-00672
| General Inspection | 8/27/2008 | 8/27/2008 | 8/27/2008 8:15:20 AM | | NR |
|
|
No work has commenced. CAS
|