FIR09-00033
| INSP-Alarm Testing | 8/27/2009 | 8/27/2009 | 8/28/2009 5:26:35 PM | P | PART |
|
|
Continued inspection completed 8/27 afternoon and evening by F. France and B. Johnson for the remainder project related fire alarm permit work FIR09-00296 including correction items. Room signage, building map, program changes, and breaker lock okayed, vesda faults tested okay, signals at main FACP verified, low air supervisory signals tested, alert and alarm signals sent/recieved, transport times at several systems measured and found to be under max. time limits, systems 22, 23, 24, 25 and 17 passed, system 18 failed. Continued testing while system 18 repaired. Sequence of operation passed for the freezer systems including rack systems 26,27,28,29, and area served. Repairs at system 18 modules and VESDA completed and retested okay per B. Johnson. Final pending NFPA 72 record of inspection and testing and record of completion documents for signature.
|
FIR09-00296
| INSP-Alarm Testing | 8/26/2009 | 8/27/2009 | 8/28/2009 5:24:51 PM | P | PART |
|
|
Continued inspection completed 8/27 afternoon and evening by F. France and B. Johnson for the remainder permit work including correction items. Room signage, building map, program changes, and breaker lock okayed, vesda faults tested okay, signals at main FACP verified, low air supervisory signals tested, alert and alarm signals sent/recieved, transport times at several systems measured and found to be under max. time limits, systems 22, 23, 24, 25 and 17 passed, system 18 failed. Continued testing while system 18 repaired. Sequence of operation passed for the freezer systems including rack systems 26,27,28,29, and area served. Repairs at system 18 modules and VESDA completed and retested okay per B. Johnson. Final pending NFPA 72 record of inspection and testing and record of completion documents for signature.
|
FIR09-00328
| FIR-Aging Inspection | 8/27/2009 | 8/27/2009 | 8/28/2009 12:59:02 PM | | DONE |
|
|
Pending site inspection request for work completed.
|
FIR09-00389
| INSP-Final Inspection | 8/27/2009 | 8/27/2009 | 8/28/2009 12:53:46 PM | P | CANC |
|
|
Precluded by work on FIR09-00296.
|
FIR09-00388
| INSP-Final Inspection | 8/27/2009 | 8/27/2009 | 8/28/2009 12:53:24 PM | P | CANC |
|
|
Precluded by work on FIR09-00296.
|
FIR09-00387
| INSP-Final Inspection | 8/27/2009 | 8/27/2009 | 8/28/2009 12:52:53 PM | P | CANC |
|
|
Precluded by work on FIR09-00296.
|
FIR09-00505
| INSP-Sprinkler Rough-in | 8/27/2009 | 8/27/2009 | 8/28/2009 12:34:36 PM | P | NR |
|
|
Per site visit by T. Frost dated 8/27/09, work is incomplete and not ready for inspection as requested.
|
FIR09-00485
| INSP-Sprinkler Rough-in | 8/26/2009 | 8/27/2009 | 8/28/2009 12:32:06 PM | A | PART |
|
|
Fire sprinkler system modifications for the scope of work are approved for cover per inspection completed by T. Frost, contractor was notified a hydrostatic test will be necessary due to over 20 heads affected.
|
FIR09-00164
| INSP-Alarm Testing | 8/27/2009 | 8/27/2009 | 8/28/2009 12:28:43 PM | P | PART |
|
|
Fire alarm testing is not ready at this time, contractor requested inspection type be changed to begin 24 hr. air test of the new dry sprinkler system- Test started at 3:00pm @ 43psig 8/27/09 by T. Frost.
|
FIR07-00515
| INSP-Sprinkler Rough-in/Hydro | 8/26/2009 | 8/27/2009 | 8/28/2009 12:25:51 PM | P | PART |
|
|
See inspection notes per site visit by T. Frost -Ok to cover. However, there is inadequate coverage under the outside canopy on both levels. I advised the fitter that due to the limited water supply it may be inadvisable to cover the piping until a new plan was designed for protection of the outside canopies. The pipe size may be inadequate to supply all of the sidewall sprinklers.
|
FIR09-00509
| INSP-Final Inspection | 8/27/2009 | 8/27/2009 | 8/27/2009 1:02:01 PM | A | PASS |
|
|
Fire sprinkler permit work passed both rough-in and final inspections completed at the same time, C/N items are finished.
|
FIR09-00508
| INSP-Sprinkler Rough-in/Hydro | 8/27/2009 | 8/27/2009 | 8/27/2009 1:00:50 PM | A | PART |
|
|
Overhead work per the scope of permit at the tenant remodel is good for cover at the drop ceilings.
|
BLD09-01406
| FIRE-Final Inspection | 8/26/2009 | 8/27/2009 | 8/27/2009 12:59:31 PM | A | FAIL |
|
|
Second exit door not shown on plans at the south side of the tenant space must be provided with approved hardware per IFC and IBC standards as discussed.
|
FIR09-00164
| INSP-Sprinkler Rough-in/Hydro | 8/26/2009 | 8/27/2009 | 8/27/2009 12:57:23 PM | A | PART |
|
|
Hydrostatic testing completed satisfactory for the new attic and second floor dry system.
|
BLD09-00302
| FIRE-Final Inspection | 8/26/2009 | 8/27/2009 | 8/27/2009 12:55:56 PM | A | DEFR |
|
|
Permit details do not indicate any project required fire inspection signatures are applicable.
|
FIR09-00477
| INSP-Final Inspection | 8/26/2009 | 8/27/2009 | 8/27/2009 12:54:26 PM | A | FAIL |
|
|
Report at off site monitoring does not indicate correct zone, type or description of account activity for test signals sent, no alarms recieved.
|