Inspections for the day of: Friday, August 27, 2010.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC09-00198 General Inspection ESC8/27/20108/27/20108/27/2010 2:22:58 PM FAIL
Correction to RP, unmaintained silt fence is still not removed. Remove or install correctly by the end of the day of Friday, Sept. 10th or a Stop Work Order will be issued on Monday, Sept 13th.
ESC10-00573 Site Preparation8/27/20108/27/20108/27/2010 1:43:18 PM PART
Verbal to RP: Remove concrete material from ground surface and place in dumpster or wash out pit. Sediment barrier (straw wattle) around the pond and ditch not installed correctly, not staked or trenched in. Complete all corrections by the end of the day of Monday, Aug. 30. Re-inspection will occurr Tuesday or Wednesday. Also, questioned operator about area of disturbance and the possilbe need to secure coverage with EPA under the Construction General Permit.
ESC10-00495 Complaint Inspection8/27/20108/27/20108/27/2010 10:57:50 AMAFAIL
Responded to the compliant, verbal correction to rp/contractor: Expand rock entrance, containerize pump and fuel at creek, sweep street on a daily basis as needed to reduce trackout. Will follow up next Tuesday, 8/31/10.