FIR10-00202
| INSP-Final Inspection | 8/24/2010 | 8/27/2010 | 8/27/2010 3:49:17 PM | A | FAIL |
|
|
The facp and dialer were verified. But inspection was stopped after it was found that instead of just monitor modules being installed at all of the existing duct smoke detectors, new duct smoke detectors had been installed which are being powered from the facp. Also duct smoke detectors are being used for the control of what appear to be fire/smoke dampers.
|
FIR10-00407
| INSP-Sprinkler Rough-in | 8/26/2010 | 8/27/2010 | 8/27/2010 3:37:08 PM | A | PASS |
|
|
The 5' underground supply piping stub out is ok for cover.
|
FIR10-00330
| INSP-Final Inspection | 8/25/2010 | 8/27/2010 | 8/27/2010 9:39:46 AM | A | FAIL |
|
|
Provide map at the facp and provide supervisory signal as discussed due to the existing panel being capable of this output to the monitoring station.
|
FIR10-00328
| INSP-Final Inspection | 8/25/2010 | 8/27/2010 | 8/27/2010 9:38:35 AM | A | PASS |
|
|
Permit finaled
|