Inspections for the day of: Monday, August 27, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD11-02613 FIRE-Final Inspection8/27/20128/27/20128/27/2012 3:59:50 PMPPASS
Life safety passed. The lever hardware for the west exit door and the building address to be installed prior to the building inspection.
FIR11-00543 INSP-Supply line flush8/27/20128/27/20128/27/2012 3:58:06 PMPPASS
The forward flow test passed.
BLD12-01752 FIRE-Final Inspection8/27/20128/27/20128/27/2012 3:56:06 PMPFAIL
No city approved plans on site for the inspection. I noted that the exit sign and emergency lights functioned and the fire extinguisher was placed.
FIR12-00373 INSP-Alarm Testing8/27/20128/27/20128/27/2012 3:54:24 PMPFAIL
One of the two strobes needed the candella increased to meet code while I waited. When the manual pull station was activated the horn strobes did not activate. Inspection failed. Also need updated as-builts showing the relocated strobe and the one with the increased candella.
BLD12-01039 FIRE-Final Inspection8/27/20128/27/20128/27/2012 3:51:55 PMPPASS
life safety passed
FIR12-00285 INSP-Final Inspection8/27/20128/27/20128/27/2012 2:03:31 PMPPASS
Permit finaled. The hydro test and head change out will be addressed under the tenant permit.
FIR12-00351 INSP-Final Inspection8/24/20128/27/20128/27/2012 11:11:45 AMAPASS
Permit finaled. Colton was going to return with the correct size batteries. The additional tamper switches to be shown on the tenant built out fire alarm drawings.
BLD12-00851 FIRE-Final Inspection8/24/20128/27/20128/27/2012 8:57:50 AMAFAIL
I left message on the contacts voice mail and also met the electrician for testing of the smoke evac system but the project was locked with no access. No inspection was performed.