Inspections for the day of: Wednesday, August 27, 2014.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00614 INSP-Final Inspection8/26/20148/27/20148/28/2014 8:45:07 AMPPASS
Permit finaled
FIR14-00464 INSP-Sprinkler Rough-in8/27/20148/27/20148/27/2014 2:56:56 PMPCANC
Not ready for an inspection yet due to no piping in the trench.
FIR14-00199 INSP-Final Inspection8/26/20148/27/20148/27/2014 2:54:17 PMAFAIL
No additional notification devices are needed per Lee but the as-builts need to be approved prior to a final sign off. Any corrections noted on the newly approved plans will need to be implimented.
BLD14-00361 FIRE-Final Inspection8/27/20148/27/20148/27/2014 2:41:18 PMPFAIL
Relocate address to the street side of the building, provide signage on the riser room door and provide knox box.
FIR14-00413 INSP-Final Inspection8/26/20148/27/20148/27/2014 2:06:31 PMAFAIL
Not ready for a final yet but we did verify that the flow switch and single tamper switch to the three story office was functional. We stopped the inspection after this due to installation (addresses/physical location) did not match the approved plans. As-bults are needed. I noted that not all manual pull stations meet height requirements of NFPA 72 and will need to be corrected. No testing of the suppression system was performed. FACP panel/batteries/power supply was verified. Need breaker labeling and lockout.
FIR14-00256 INSP-Final Inspection8/26/20148/27/20148/27/2014 1:49:02 PMAPASS
Permit finaled
FIR13-00639 INSP-Sprinkler Rough-in/Hydro8/26/20148/27/20148/27/2014 10:49:09 AMAPART
24 hour air test started at 9:00am with pressure marked on guage. Roughin on second pit and piping under equipment passed except it appears a longitudinal bracing is missing on the 3" main.
FIR14-00396 INSP-Sprinkler Rough-in/Hydro8/26/20148/27/20148/27/2014 10:47:08 AMAPASS
Overhead hydro test passed and the tenting is now complete. Piping can be covered.