FIR14-00614
| INSP-Final Inspection | 8/26/2014 | 8/27/2014 | 8/28/2014 8:45:07 AM | P | PASS |
|
|
Permit finaled
|
FIR14-00464
| INSP-Sprinkler Rough-in | 8/27/2014 | 8/27/2014 | 8/27/2014 2:56:56 PM | P | CANC |
|
|
Not ready for an inspection yet due to no piping in the trench.
|
FIR14-00199
| INSP-Final Inspection | 8/26/2014 | 8/27/2014 | 8/27/2014 2:54:17 PM | A | FAIL |
|
|
No additional notification devices are needed per Lee but the as-builts need to be approved prior to a final sign off. Any corrections noted on the newly approved plans will need to be implimented.
|
BLD14-00361
| FIRE-Final Inspection | 8/27/2014 | 8/27/2014 | 8/27/2014 2:41:18 PM | P | FAIL |
|
|
Relocate address to the street side of the building, provide signage on the riser room door and provide knox box.
|
FIR14-00413
| INSP-Final Inspection | 8/26/2014 | 8/27/2014 | 8/27/2014 2:06:31 PM | A | FAIL |
|
|
Not ready for a final yet but we did verify that the flow switch and single tamper switch to the three story office was functional. We stopped the inspection after this due to installation (addresses/physical location) did not match the approved plans. As-bults are needed. I noted that not all manual pull stations meet height requirements of NFPA 72 and will need to be corrected. No testing of the suppression system was performed. FACP panel/batteries/power supply was verified. Need breaker labeling and lockout.
|
FIR14-00256
| INSP-Final Inspection | 8/26/2014 | 8/27/2014 | 8/27/2014 1:49:02 PM | A | PASS |
|
|
Permit finaled
|
FIR13-00639
| INSP-Sprinkler Rough-in/Hydro | 8/26/2014 | 8/27/2014 | 8/27/2014 10:49:09 AM | A | PART |
|
|
24 hour air test started at 9:00am with pressure marked on guage. Roughin on second pit and piping under equipment passed except it appears a longitudinal bracing is missing on the 3" main.
|
FIR14-00396
| INSP-Sprinkler Rough-in/Hydro | 8/26/2014 | 8/27/2014 | 8/27/2014 10:47:08 AM | A | PASS |
|
|
Overhead hydro test passed and the tenting is now complete. Piping can be covered.
|