ESC14-00135
| General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 1:49:55 PM | | PART |
|
|
Landscaping of yard is near completion.
Request to builder and or landscaping company to hydroseed/stabilize disturbed hillside areas outside of yard used for access by equipment. Will need to install wattle at toe of slope to keep sediment from running off onto culdesac into stormwater system.
|
ESC15-00094
| Random Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 1:13:24 PM | P | PASS |
|
|
No activity in new phase of Boulder Heights. Roads, gutters, and utilities are complete.
Hillside that were graded have been properly tracked horizontally and temporary erosion control and sediment containment wattles have been installed. No rill or gully erosion observed. No loose sediment on hard surfaces. Approved.
|
ESC14-01035
| Random Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 1:02:14 PM | P | PASS |
|
|
Home construction near completion. Yard is landscaped. Area below yard that was disturbed to install roof top stormdrain system connection was hydroseeded. Will continue to monitor revegetation and final site clean up.
|
ESC15-01035
| Random Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 1:01:46 PM | P | CANC |
|
|
no inspection conducted, data entry error
|
ESC15-00861
| General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 12:43:28 PM | P | PASS |
|
|
NO activity at site. Site has has perimter wattles trenched in as requested. Permit sign is posted, no sediment or other materials leaving site. Home site has been excavated but no foundation work yet. Approved.
|
ESC13-00684
| General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 12:37:43 PM | | PART |
|
|
Individual homes in Antelope Springs are in progress. Multiple contractors have not been using concrete washouts on recent projects.
No significant trackout or discharges to stormwater system. Site needs clean up and housekeeping Will work with individual contractors to clean up litter and uncontained concrete dumps.
|
ESC13-00755
| General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 12:34:39 PM | | PASS |
|
|
The west end of the Terraces is landscaped, paved and construction is complete. Residents are already living in the condo units and some of the hospital building.
Construction is remaing along the east end of site. All construction traffic is using the east entrance off Lysted. No significant trackout from site or laydown yard.
All DI bags are installed around the perimeter, so will need to make sure Petra removes them when complete with disturbed areas.
|
ESC14-00206
| General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 12:31:10 PM | | CANC |
|
|
rescheduled
|
ESC15-00219
| Site Final | 8/27/2015 | 8/27/2015 | 8/27/2015 12:13:53 PM | P | PASS |
|
|
Home is complete, landscaped, and occupied. DI bag in alley will remain until two active SFHs are still in progress. Will have Hunter Homes remove DI bags when all homes complete on this block of Timbersaw and Barnside.
Permit finaled
|
ESC15-00238
| Aging Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 12:13:15 PM | | PASS |
|
|
Home is complete, landscaped, and occupied. DI bag in alley will remain until two active SFHs are still in progress. Will have Hunter Homes remove DI bags when all homes complete on this block of Timbersaw and Barnside.
Permit finaled
|
ESC15-00238
| DOC - Permit Finaled | 8/27/2015 | 8/27/2015 | 8/27/2015 12:09:42 PM | P | PASS |
|
|
|
ESC15-00212
| General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 11:40:49 AM | A | PASS |
|
|
WIP. Gift shop building is complete. Some exterior work remaining. Area will not be able to be vegetated till next Spring most likely per Craig Stevens Zoo Boise Facility Manager.
No stormwater pollution issues observed.
|
ESC14-00689
| Site Final | 8/27/2015 | 8/27/2015 | 8/27/2015 11:34:49 AM | P | PASS |
|
|
11 AMn with Craig Stevens
Seeded grass has vegetated >70% of the disturbed area around the new small animal holding pen structure. No loose sediment leaving construction area, minor work in progress. Remaining animal area will remain dirt and straw.
ESC permit conditions satisfied.
|
ESC13-00655
| General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 10:19:26 AM | | PASS |
|
|
WIP on landscaping around new buildings. Storm drains have inlet protection, no trackout, all roads and parking lots are paved and curved. Ongoing projects have trash containment; periodic sweeping is conducted around the perimeter. Approved.
|
ESC15-00249
| Aging Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 9:55:49 AM | | PASS |
|
|
|
ESC15-00350
| Aging Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 9:28:56 AM | | PASS |
|
|
Staging yard for ACHD road project(s) is being utilized. No trackout or polluted runoff observed from site. No fugitive dust plumes observed.
No corrections needed.
|
ESC15-00273
| Aging Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 9:03:33 AM | | PASS |
|
|
Home complete and is landscaped & stabilized. ESC permit conditions met, all other permits finaled.
|
ESC15-00273
| DOC - Permit Finaled | 8/27/2015 | 8/27/2015 | 8/27/2015 9:02:06 AM | P | PASS |
|
|
|