ESC13-00707
| General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 12:01:46 PM | | FAIL |
|
|
New Silt Fence still has not been installed as, I stated and gave Bob Borrow and his crew several weeks ago during out onsite meeting with PW to have installed by the end of the week (that was a 48hr warning). Called Bob and left VM asking for an eta on installation and that he has 48hrs from now, or money from the his Bond will be pulled and I will hire another contractor to install the BMP's.
|
ESC13-00520
| General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 12:00:21 PM | | FAIL |
|
|
New Silt Fence still has not been installed as, I gave Bob Borrow and his crew several weeks ago during out onsite meeting with PW. Called Bob and left VM asking for an eta on installation and that he has 48hrs from now, or money from the his Bond will be pulled and I will hire another contractor to install the BMP's.
|
ESC15-00359
| Aging Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 10:30:56 AM | | PASS |
|
|
|
ESC15-00359
| DOC - Permit Finaled | 8/27/2015 | 8/27/2015 | 8/27/2015 10:30:48 AM | P | PASS |
|
|
Project Complete ESC Conditions Satisfied
|
ESC14-00432
| General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 9:10:20 AM | | PART |
|
|
Concrete Washout needs severe maintenance. over 90% full, with spillage taking place. Contacted Eric Bird who was the RP, is no longer with McMasters. Contacted Jerry Taylor and he also has nothing to do with the project. Then I attempted to contact Hayden Homes Bill Duffey and left vm disclosing the violation. Will follow up tomorrow to see if the correction has been made.
|
ESC13-01159
| General Inspection | 8/27/2015 | 8/27/2015 | 8/27/2015 8:34:09 AM | | PASS |
|
|
|