ELE18-02338
| Final | 8/27/2018 | 8/27/2018 | 8/27/2018 2:34:02 PM | P | PASS |
|
|
garage code 1957e Phone #: ###-#### Inspection requested via web by Alan Lusk Ok final.
|
ELE18-03235
| Rough-In Permanent Service | 8/27/2018 | 8/27/2018 | 8/27/2018 2:12:20 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dustin Kuester p/s u/g n ok
|
ELE18-03256
| Rough-In Permanent Service | 8/27/2018 | 8/27/2018 | 8/27/2018 2:11:57 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Robert Murray p/s u/g n ok
|
ELE18-03181
| Rough-In Permanent Service | 8/26/2018 | 8/27/2018 | 8/27/2018 1:30:50 PM | P | PASS |
|
|
Hooking up new service, moving panel out of closet and downstairs. Phone #: ###-#### Inspection requested via web by David Kubik p/s o/h rec ok
|
ELE18-01934
| Final | 8/27/2018 | 8/27/2018 | 8/27/2018 1:06:14 PM | P | PASS |
|
|
Please call to schedule time to get in. I will meet you there. Thank you Phone #: ###-#### Inspection requested via web by Eric Brown Ok final lighting in living and kitchen, and kitch receps.
|
ELE18-01558
| Electrical Rough-In | 8/27/2018 | 8/27/2018 | 8/27/2018 1:03:48 PM | P | FAIL |
|
|
main commons drop cielling Phone #: ###-#### Inspection requested via web by steve cooper I dont know everything that I need to look at. The number listed for contact has been called multiple times with messages left. I have never had a return phone call to date from this number. I need the electricians contact info for future inspections to be done.
|
ELE16-02764
| Final | 8/27/2018 | 8/27/2018 | 8/27/2018 12:08:46 PM | P | PASS |
|
|
Please give me half an hour notice before inspection to insure access. Thank you Shaun ###-#### Phone #: ###-#### Inspection requested via web by Shaun Kirkman Ok final lights added in main living and stairs.
|
ELE18-03206
| Electrical Rough-In | 8/24/2018 | 8/27/2018 | 8/27/2018 11:34:44 AM | A | PASS |
|
|
Mike Phone #: ###-#### Ok cover walls.
|
ELE18-03150
| Final | 8/26/2018 | 8/27/2018 | 8/27/2018 11:34:28 AM | A | PASS |
|
|
I have job photos, paperwork, Solar Module and Inverter beside the IP meter. there is a photo on how we find the center of each rafter for attachment. We use a modified WalBot and Android phone. Call with any questions,Dave ###-#### Phone #: ###-#### Inspection requested via web by Dave Brueggemann Ok final.
|
ELE18-03150
| Electrical Rough-In | 8/27/2018 | 8/27/2018 | 8/27/2018 11:34:09 AM | A | PASS |
|
|
All items UL listed.
|
ELE18-03255
| Temporary Service | 8/24/2018 | 8/27/2018 | 8/27/2018 9:18:26 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ben Archibald t/s u/g n ok
|
ELE18-03259
| Electrical Rough-In | 8/27/2018 | 8/27/2018 | 8/27/2018 9:15:01 AM | P | CANC |
|
|
Please call Jimmy @ ###-####, 30 minutes prior to arrival so we can get you in Phone #: ###-#### >> Inspection requested via web by John Edwards Inspection cancelled from web by: John Edwards
|
ELE18-03257
| Electrical Rough-In | 8/26/2018 | 8/27/2018 | 8/27/2018 8:51:58 AM | A | PASS |
|
|
Installed 2 inch PVC for service run. Need ok to cover. Any questions please let me know. Thank you. Phone #: ###-#### Inspection requested via web by David Kubik Ok cover grd work.
|