PLM95-00700
| INSP - Plumbing Rough-in | 8/28/1995 | 8/28/1995 | 8/29/1995 12:00:00 AM | P | PASS |
|
|
08/28/95 334 - READY PM
|
PLM95-00721
| INSP - Ground work | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | | PASS |
|
|
/ / 334 -
|
PLM95-00741
| INSP - Sprinkler & Backflow | 8/25/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | PART |
|
|
needs clearances and cert. gz
|
PLM95-00741
| INSP - Sprinkler & Backflow | 8/25/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | PART |
|
|
08/28/95 334 - needs clearances and plugs gz
|
PLM95-00747
| INSP - Sewer and Water lines | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | PASS |
|
|
08/28/95 334 -
|
PLM4047587
| INSP - Final | 8/25/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | PART |
|
|
08/28/95 334 - signed temp occupuancy - needs rp on water cooled compres needs air gap on large icemachine needs air gap on backroom handsink,waste line caulk mop sink certify all backflow devices therma
|
PLM95-00675
| INSP - Plumbing Rough-in | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | P | PART |
|
|
08/28/95 334 - ok to cover all areas, need to verify tie in of vent on 3 vent system , they may have connected into a roof leader in the same are need to physcial verify this piping before final occupauncy, also need to adress ther
|
PLM95-00719
| INSP - Water lines | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | P | PART |
|
|
08/28/95 334 - partial bury water ok gz check connections both ends when
|
PLM95-00760
| INSP - Sewer and Water lines | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | P | FAIL |
|
|
08/28/95 334 - size waterline table 10-2 upc left correction notice
|