MEC3047737
| INSP - Final | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | | PASS |
|
|
/ / 350 - FNL -OK FINAL cabinets on either side of gas range have been raised
|
MEC3047737
| INSP - Final | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | | PASS |
|
|
|
MEC3047737
| INSP - Final | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | | PASS |
|
|
|
MEC95-00213
| INSP - Final | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | | PASS |
|
|
/ / 350 - FNL -OK FINAL
|
MEC95-00391
| INSP - Final | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | | NR |
|
|
/ / 350 -
|
MEC95-00391
| INSP - Final | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | | PASS |
|
|
/ / 350 - FNL -OK FINAL
|
MEC95-00687
| INSP - Gas pressure test | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | | PASS |
|
|
/ / 350 - GP -OK GAS PIPING #27927
|
MEC95-00688
| INSP - Framing/ Rough-in | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | | FAIL |
|
|
/ / 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need fire stops 2nd and attic penetrations
|
MEC95-00688
| INSP - Gas pressure test | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | | PASS |
|
|
/ / 350 - GP -OK GAS PIPING #27925
|
MEC95-00458
| INSP - Gas pressure test | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | | PASS |
|
|
/ / 350 - GP -OK GAS PIPING #27923
|
MEC95-00416
| INSP - Final | 8/25/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | PASS |
|
|
08/25/95 350 - FNL -OK FINAL
|
MEC95-00416
| INSP - Final | 8/25/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | PASS |
|
|
08/25/95 350 - FNL -OK FINAL
|
MEC95-00422
| INSP - Gas pressure test | 8/25/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | PASS |
|
|
08/25/95 350 - NORTH SIDE OF CHURCH GP -OK GAS PIPING #27921 10# system to new gas fired equipment on roof f the main church upstairs.
|
MEC95-00458
| INSP - Framing/ Rough-in | 8/25/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | PASS |
|
|
08/25/95 350 - FURN-FURNACE OK FNL -OK FINAL
|
MEC3045253
| INSP - Final | 8/25/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | CANC |
|
|
08/25/95 350 -
|
MEC3045253
| INSP - Final | 8/25/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | CANC |
|
|
08/25/95 350 -
|
MEC3047624
| INSP - Final | 8/25/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | PASS |
|
|
08/25/95 350 - FNL -OK FINAL
|
MEC3047624
| INSP - Final | 8/25/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | A | PASS |
|
|
08/25/95 350 - FNL -OK FINAL
|
MEC95-00261
| INSP - Final | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | P | FAIL |
|
|
08/28/95 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need to support flex pipe in crawlspace
|
MEC95-00261
| INSP - Final | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | P | FAIL |
|
|
08/28/95 350 - CORR-CORREC-CALL FOR REINSP WHEN COMPLETED need to support flex pipe in crawlspace
|
MEC95-00689
| INSP - Gas log/ Fireplace | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | P | PASS |
|
|
08/28/95 350 - f/p ok
|
MEC95-00687
| INSP - Retro Fit (check note) | 8/28/1995 | 8/28/1995 | 8/28/1995 12:00:00 AM | P | FAIL |
|
|
08/28/95 350 - furnace ok but need to seal holes through the front of house
|