ELE00-03122
| Final | 8/24/2000 | 8/28/2000 | 8/28/2000 12:00:00 AM | A | FAIL |
|
|
marv ###-#### 1st thing am please if possible Ground rods flush Guy within 3' bond hot water take grounding electrode conductor to neutral bus 8/28/2000 12:38:46 PM
|
ELE00-03062
| Temporary Service | 8/25/2000 | 8/28/2000 | 8/28/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 07:40:02. Contact: ###-####.
|
ELE00-03328
| Final | 8/25/2000 | 8/28/2000 | 8/28/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 13:26:54. Contact: ###-####. Requires deternination of 1 or 2 buildings by structural and Conf.based on results 8/28/2000 12:36:19 PM
|
ELE00-03264
| Electrical Rough-In | 8/25/2000 | 8/28/2000 | 8/28/2000 12:00:00 AM | A | PASS |
|
|
R/I= UNDERGROUND INSP- ###-####- KURT
|
ELE00-03331
| Rough-In Permanent Service | 8/25/2000 | 8/28/2000 | 8/28/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/25/2000 at 14:36:42. Contact: ###-####. P/S ok R/I Not finished 8/29/2000 7:21:55 AM
|
ELE00-03222
| Permanent Service | 8/28/2000 | 8/28/2000 | 8/28/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 07:59:44. Contact: ###-####.
|
ELE00-03332
| Electrical Rough-In | 8/28/2000 | 8/28/2000 | 8/28/2000 12:00:00 AM | P | PASS |
|
|
front entry r/i dan ###-####
|
ELE00-02076
| Final | 8/28/2000 | 8/28/2000 | 8/28/2000 12:00:00 AM | P | FAIL |
|
|
this is for a temp occ Sid ###-#### 250-148 open wires sheetmetal screws for grounding support raceways 8/29/2000 7:20:35 AM
|
ELE00-03282
| Electrical Rough-In | 8/28/2000 | 8/28/2000 | 8/28/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 11:10:30. Contact: ###-####. underground 8/29/2000 7:21:06 AM
|