Inspections for the day of: Monday, August 28, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-02860 Final8/25/20008/28/20008/28/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/25/2000 at 08:37:39. Contact: .
BLD00-01771 BLD-Framing/Rough-in8/25/20008/28/20008/28/2000 12:00:00 AMAPART
RE-INSP-FR----- FOR HOMEOWNER-- ###-####--CALL 1ST BEFORE INSP
no one home, looked at outside straps only, work in progress, looks ok, need to call for re-inspect for all framing. 8/28/2000 10:33:35 AM
MEC00-02752 Pressure Test8/25/20008/28/20008/28/2000 12:00:00 AMAPASS
Joe ###-####
20 psi for 20 mins. 8/28/2000 10:12:18 AM
BLD00-02510 BLD-Footing8/25/20008/28/20008/28/2000 12:00:00 AMAPART
Ed ###-####
BLD00-02399 BLD-Final8/25/20008/28/20008/28/2000 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/25/2000 at 13:30:27. Contact: ###-####.
c/n left on bracing and nailing,,, eng. system 8/28/2000 4:16:36 PM
BLD00-01846 BLD-Framing/Rough-in8/25/20008/28/20008/28/2000 12:00:00 AMPPASS
CK SCREWS-- FOR HOMEOWNER--- DAWN ###-####
ok on sheetrock screws 8/28/2000 12:07:13 PM
BLD00-02482 BLD-Footing8/28/20008/28/20008/28/2000 12:00:00 AMPPART
adrian-- ###-#### ft
ok w/ verbal corrections 8/28/2000 4:47:03 PM
BLD00-02174 BLD-Conference8/28/20008/28/20008/28/2000 12:00:00 AMPPASS
###-####
conf. on monolithic pour, ok, to do. ,,, roots, grade, etc. 8/28/2000 3:36:47 PM
BLD00-01723 BLD-Framing/Rough-in8/28/20008/28/20008/28/2000 12:00:00 AMPPASS
JAKE ###-#### FR INSP
BLD00-01197 BLD-Framing/Rough-in8/25/20008/28/20008/28/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/25/2000 at 08:29:56. Contact: ###-####.
double check width of stairs @ final 8/28/2000 3:34:54 PM