FIR01-00138
| INSP-Final Inspection | 8/27/2001 | 8/28/2001 | 8/28/2001 12:00:00 AM | A | PASS |
|
|
Ok on supply line flush Permit now finaled 8/28/2001 10:51:52 AM
|
FIR01-00100
| INSP-Sprinkler Rough-in/Hydro | 8/27/2001 | 8/28/2001 | 8/28/2001 12:00:00 AM | A | CANC |
|
|
Cancel to be rescheduled 8/28/2001 11:34:33 AM
|
FIR01-00343
| INSP-Sprinkler Rough-in/Hydro | 8/27/2001 | 8/28/2001 | 8/28/2001 12:00:00 AM | A | PART |
|
|
OK above ground hydro test on system # 4 8/27/2001 4:59:39 PM
|
BLD01-01942
| FIRE-Final Inspection | 8/27/2001 | 8/28/2001 | 8/28/2001 12:00:00 AM | A | PASS |
|
|
Final Pass OK for certificate of completion 8/28/2001 12:00:17 PM
|
BLD01-01651
| FIRE-Final Inspection | 8/27/2001 | 8/28/2001 | 8/28/2001 12:00:00 AM | P | PART |
|
|
Final OK for temporary occupancy. need to move one line of spklrs that are overspaced. Heads were overspaced sometime during previous occupancy. 8/28/2001 4:18:29 PM
|
BLD00-03691
| FIRE-Final Inspection | 8/24/2001 | 8/28/2001 | 8/24/2001 12:00:00 AM | P | NR |
|
|
Not ready for insp 8/24/2001 2:15:25 PM
|