Inspections for the day of: Wednesday, August 28, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-00906 Other8/27/20028/28/20028/28/2002 12:00:00 AMAPART
conference on scope of utility work with Laton and CSHQA, ken snider, will call with time got it stright now, dibble needs 2 air tests on storm drain stubs on the north side, percission needs to expose storm drain laterials on the north west side , 3" water to cooling towers west side and s.s. around grease interceptor south side, the rest of percissions isnt installed yet. 8/28/2002 4:19:50 PM
PLM02-02631 Groundwork8/27/20028/28/20028/28/2002 12:00:00 AMAPASS
###-#### added a sink
PLM02-02627 Sprinkler (Final)8/27/20028/28/20028/28/2002 12:00:00 AMANR
###-#### ROB this was a s/w permit 8/27/2002 3:40:22 PM
PLM02-01884 Final8/27/20028/28/20028/28/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 08/27/2002 at 14:52:29. Contact: ###-####. house seems ok but they need a permit for the sprinkler system 8/28/2002 2:47:14 PM
PLM02-01973 Final8/27/20028/28/20028/28/2002 12:00:00 AMAPASS
fn craig- ###-#### lock box for front door is 139
PLM02-00129 Final8/27/20028/28/20028/28/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 08/27/2002 at 21:05:19. Contact: ###-####. called in t 8/28/2002 11:54:30 AM e wrong permit 8/28/2002 11:54:37 AM
PLM02-00230 Final8/28/20028/28/20028/28/2002 12:00:00 AMAPASS
the ri for this jobwas done on 6/3/02 they had called in the wrong permit number. final ok
PLM02-02595 Final8/28/20028/28/20028/28/2002 12:00:00 AMPNR
###-#### couldnt get together today will inspect tomarrow pm 8/28/2002 4:20:46 PM
PLM02-02661 Plumbing Rough-in8/28/20028/28/20028/28/2002 12:00:00 AMPPASS
lee ###-#### ri ok with nps at main shut off valve 8/28/2002 3:05:58 PM
PLM02-02426 Final8/28/20028/28/20028/28/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 08/28/2002 at 09:23:41. Contact: ###-####. get as much clearance between t&p drain and water heater flue as possible 8/28/2002 2:11:07 PM
PLM02-01019 Final8/28/20028/28/20028/28/2002 12:00:00 AMPPASS
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie