Inspections for the day of: Wednesday, August 28, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00276 BLD-Conference8/27/20028/28/20028/29/2002 12:00:00 AMPNR
For t/o review
BLD02-00377 BLD-Conference8/28/20028/28/20028/28/2002 12:00:00 AMANH
need modify permit for 2nd fl, see plan chk.
BLD02-01696 BLD-Conference8/28/20028/28/20028/28/2002 12:00:00 AMAPASS
w/ John Larson, Arch....ok to clean fireproofing off mesh at beams or equal
BLD02-01697 BLD-Conference8/28/20028/28/20028/28/2002 12:00:00 AMAPASS
w/ arch, ok to clean mesh at roof joists; relocate sprinklers per NFPA
BLD02-00921 BLD-Conference8/28/20028/28/20028/28/2002 12:00:00 AMAPASS
rec'd affidavit...consulted w/ Dan S. re other portions of project
BLD02-00377 BLD-Conference8/28/20028/28/20028/28/2002 12:00:00 AMPPART
W/ MATT...REFERRED TO PLAN CHK FOR MODIFICATION TO RESIDENTIAL PLANS...ADDED 2ND FL.
BLD02-00967 BLD-Framing/Rough-in8/28/20028/28/20028/28/2002 12:00:00 AMPPART
###-#### screen walls at entry(s) ok; finishes at 48" opening. 8/28/2002 2:18:18 PM
BLD02-01762 BLD-Conference8/27/20028/28/20028/28/2002 12:00:00 AMPFAIL
Re: insps/permits...no one at site, left c/n to obtain all other insps. hand rails not installed at stairs or ramp. 8/28/2002 6:22:48 PM
BLD02-00527 BLD-Final8/27/20028/28/20028/28/2002 12:00:00 AMPNR
###-#### finals on unit #'s 120,121,122,220,221,222...need htg final on these units, left msg. 8/28/2002 6:00:00 PM