FIR02-00214
| INSP-Alarm Testing | 8/27/2002 | 8/28/2002 | 8/28/2002 12:00:00 AM | A | FAIL |
|
|
provide knox key box, provide proper orfice in the sprinkler system test line, move duct smoke detectors from the return side to the supply side, move smoke detector that is over the panel to the deck 8/28/2002 9:33:30 AM
|
BLD02-00964
| FIRE-Final Inspection | 8/27/2002 | 8/28/2002 | 8/28/2002 12:00:00 AM | A | FAIL |
|
|
provide fire extinguisher, lock on the restroom door locks people in so it needs changed, door hardware on storage room needs to be changed to approved type, provide approved plans on site so I can finish the inspection 8/28/2002 10:55:24 AM
|
FIR02-00284
| INSP-Supply line flush | 8/27/2002 | 8/28/2002 | 8/28/2002 12:00:00 AM | P | PART |
|
|
upstairs sprinkler heads are OK but the piping still needs eq bracing and retaining straps. The down stairs main reroute looks ok but needs EQ bracing, one head needs to be relocated between floor penatrations and sprinkler head layout will need to be verified over the new mechanical units 8/28/2002 4:50:59 PM
|
BLD02-01688
| FIRE-Final Inspection | 8/28/2002 | 8/28/2002 | 8/28/2002 12:00:00 AM | P | PASS |
|
|
fire life/safety finaled and fire sprinkler finaled 8/28/2002 2:42:44 PM
|