BLD08-01788
| BLD-Footing | 8/28/2008 | 8/28/2008 | 8/28/2008 4:50:21 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/28/2008 at 8:39:26 AM. Contact: ###-####.
|
BLD08-00777
| BLD-Framing/Rough-in | 8/28/2008 | 8/28/2008 | 8/28/2008 4:05:18 PM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 8/28/2008 at 10:56:48 AM. Contact: ###-####.
|
BLD08-00788
| BLD-Framing/Rough-in | 8/28/2008 | 8/28/2008 | 8/28/2008 3:46:46 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/28/2008 at 10:55:30 AM. Contact: ###-####.
|
ESC08-00674
| Site Preparation | 8/28/2008 | 8/28/2008 | 8/28/2008 3:46:25 PM | P | PASS |
|
|
Brandon Ethridge
|
ESC08-00697
| Site Preparation | 8/28/2008 | 8/28/2008 | 8/28/2008 3:46:07 PM | P | PASS |
|
|
Tim Behrman
|
BLD08-00892
| BLD-Final | 8/27/2008 | 8/28/2008 | 8/28/2008 3:03:19 PM | P | PASS |
|
|
Duane Phone #: ###-#### (it was requested that Jim Storey have this inspection) ///dld Verified final letter from STRATA.....No discrepancies......C/C issued.
|
BLD08-00892
| DOC - Permit Finaled | 8/28/2008 | 8/28/2008 | 8/28/2008 3:02:16 PM | P | PASS |
|
|
|
BLD08-01351
| BLD-Framing/Rough-in | 8/27/2008 | 8/28/2008 | 8/28/2008 2:24:30 PM | P | PART |
|
|
kurt Phone #: ###-#### - please call 1/2 hr prior to inspection Framing appears OK.......Ok to cover areas not affected by CN.... Fix holes in R-19 ceiling insul, fix draftstop, fix all penitrations in wall adjacent to 1hr corridor, Architect to address new 20 min rated door to be installed in 1hr corridor and how it can meet ADA req. at sides of door.
|
BLD08-00813
| BLD-Framing/Rough-in | 8/27/2008 | 8/28/2008 | 8/28/2008 1:15:40 PM | A | PASS |
|
|
Mitch- late AM Phone #: ###-####
|
MIS08-00123
| BLD-Conference | 8/28/2008 | 8/28/2008 | 8/28/2008 12:19:38 PM | A | DONE |
|
|
This is for a home purchase. Please contact homeowner-Lee at the number provided at least 1/2 hour before arriving. Thank you! Phone #: ###-#### Internet Inspection Request from: Connie LaFrainer GFCIs Gar. Separation Sm Det.
|
BLD08-00698
| BLD-Conference | 8/27/2008 | 8/28/2008 | 8/28/2008 12:18:35 PM | A | DONE |
|
|
corey Phone #: ###-####
|
BLD08-01723
| BLD-Footing | 8/27/2008 | 8/28/2008 | 8/28/2008 12:17:33 PM | A | PASS |
|
|
Santos Phone #: ###-####
|
BLD08-01792
| BLD-Footing | 8/27/2008 | 8/28/2008 | 8/28/2008 11:22:10 AM | A | PASS |
|
|
jerry Phone #: ###-####
|
BLD08-01011
| BLD-Foundation | 8/27/2008 | 8/28/2008 | 8/28/2008 9:49:21 AM | A | PART |
|
|
dave - pour time is 9:30 Phone #: ###-#### Footings OK
|
BLD08-00406
| BLD-Conference | 8/27/2008 | 8/28/2008 | 8/28/2008 9:48:44 AM | A | DONE |
|
|
Talked to Chris at Excelsior Constr...Need fire final and Bldg final.
|