PLM08-02096
| Final | 8/28/2008 | 8/28/2008 | 8/28/2008 4:24:06 PM | P | PASS |
|
|
Eddie Phone #: ###-####
|
PLM07-01924
| Plumbing Rough-in | 8/27/2008 | 8/28/2008 | 8/28/2008 3:59:03 PM | P | PART |
|
|
Partial Rough In - 3rd Floor Please call Tobin with any questions ###-#### Phone #: ###-#### Internet Inspection Request from: Colleen Brown replace ferncos on 4" vent with shielded couplings...................ferncos are not approved for above ground use.........ds
|
PLM08-01545
| Final | 8/28/2008 | 8/28/2008 | 8/28/2008 3:40:18 PM | P | PASS |
|
|
Jody Phone #: ###-####
|
PLM08-01374
| Final | 8/28/2008 | 8/28/2008 | 8/28/2008 3:13:01 PM | P | PASS |
|
|
marion Phone #: ###-####
|
PLM08-00858
| Final | 8/27/2008 | 8/28/2008 | 8/28/2008 2:29:09 PM | A | PASS |
|
|
basement access should be unlocked otherwise creed can let you in if you call him at ###-####. Thanks again Daryl!! Phone #: ###-#### Internet Inspection Request from: Kelea Dunne Still an open permit plmo8-00041 to install 2" dcva on building water service...........ds
|
PLM07-03384
| Med/Gas Systems | 8/27/2008 | 8/28/2008 | 8/28/2008 1:44:35 PM | A | PART |
|
|
On site contact is Padraic @ ###-####. Phone #: ###-#### Internet Inspection Request from: Jane Amy 150 # test ok start 24 hr test............ds
|
PLM08-01854
| Plumbing Rough-in | 8/27/2008 | 8/28/2008 | 8/28/2008 12:12:19 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/27/2008 at 2:16:25 PM. Contact: ###-####.
|
PLM08-01842
| Plumbing Rough-in | 8/27/2008 | 8/28/2008 | 8/28/2008 10:13:59 AM | A | PASS |
|
|
Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
PLM08-02083
| Plumbing Rough-in | 8/27/2008 | 8/28/2008 | 8/28/2008 9:58:57 AM | A | PART |
|
|
josh roper ok to cover floor for upstairs addition............ds
|
PLM08-01861
| Final | 8/27/2008 | 8/28/2008 | 8/28/2008 9:36:27 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Ken Jones
|