PLM08-01146
| Final | 8/28/2008 | 8/28/2008 | 8/28/2008 5:16:32 PM | P | PART |
|
|
tom Phone #: ###-####-need to install a dbca on water supply for premis protection, need to move rpba's for soda machines upstream of filter systems, need to install thermal expansion, need to install 2 rpba's on each ice machine(1 on the water cooled supply & 1 on the water supply) need to run the T&P's on all water heaters, need to have all backflow device's tested & certified. temp final ok.
|
PLM08-01493
| Plumbing Rough-in | 8/28/2008 | 8/28/2008 | 8/28/2008 4:47:22 PM | P | CANC |
|
|
2:00 pm
|
PLM08-01273
| Final | 8/28/2008 | 8/28/2008 | 8/28/2008 3:39:08 PM | P | PART |
|
|
partial final....Please contact Darren Paige at # given. Phone #: ###-#### Internet Inspection Request from: Diane Houst-one wash basin on 1st flr to install. all other work complete. temp final ok.
|
PLM08-01685
| Final | 8/27/2008 | 8/28/2008 | 8/28/2008 3:11:52 PM | P | FAIL |
|
|
starbucks needs to isolate esspresso machine with a rpba, coffee machine needs a dbca, glass filler needs a seperate hot waterline isolated with a rpba or delete glass cleaner.
|
PLM08-01685
| Groundwork | 8/27/2008 | 8/28/2008 | 8/28/2008 2:55:37 PM | P | PART |
|
|
ground work for hand sink in bakery pass.
|
PLM08-01747
| Plumbing Rough-in | 8/27/2008 | 8/28/2008 | 8/28/2008 2:32:14 PM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/27/2008 at 1:43:01 PM. Contact: ###-####. can only have 3 toilets on a 3" horizontal drain. pex needs to be at least 6" from can lights. tent all overhead waterlines.
|
PLM08-02075
| Water and/or Sewer | 8/26/2008 | 8/28/2008 | 8/28/2008 1:43:11 PM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/26/2008 at 7:58:47 PM. Contact: ###-####.-1st 10' of sewer pipe from manhole installed.
|
PLM08-01295
| Final | 8/27/2008 | 8/28/2008 | 8/28/2008 12:59:26 PM | A | PASS |
|
|
Rocky Phone #: ###-####
|
ESC08-00112
| General Inspection | 8/28/2008 | 8/28/2008 | 8/28/2008 12:59:07 PM | P | PART |
|
|
left verbal correction on rp's phone to clean gutters & di box by monday mourning.
|
PLM08-00768
| Final | 8/27/2008 | 8/28/2008 | 8/28/2008 10:36:49 AM | A | FAIL |
|
|
9:30 am-need 3rd party verification on vac & compressed air. need caps off of vents on roof. need all equipment installed & hooked up. need shutoff valve for dbca for fire system. caulk all fixtures. need letter for all unfinished work. discharge for vacuum pump needs to be inderict to floor sink.
|
PLM08-02078
| Other | 8/27/2008 | 8/28/2008 | 8/28/2008 9:33:18 AM | A | FAIL |
|
|
Trevin- confrence Phone #: ###-####-need to label water at rv dump non-potable water, need cleanouts every 50'. need to test ejector discharge & inlet.
|
PLM08-02065
| Final | 8/27/2008 | 8/28/2008 | 8/28/2008 9:07:04 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/27/2008 at 3:49:41 PM. Contact: ###-####.
|
PLM08-02066
| Final | 8/27/2008 | 8/28/2008 | 8/28/2008 9:06:45 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/27/2008 at 3:50:26 PM. Contact: ###-####.
|
PLM08-01493
| Plumbing Rough-in | 8/27/2008 | 8/28/2008 | 8/28/2008 8:08:23 AM | A | NR |
|
|
9:30 am
|
PLM08-01685
| Final | 8/27/2008 | 8/28/2008 | 8/27/2008 4:35:26 PM | A | CANC |
|
|
carlos--fn on coffee shop only Phone #: ###-####
|
PLM08-01685
| Plumbing Rough-in | 8/27/2008 | 8/28/2008 | 8/27/2008 4:35:04 PM | A | CANC |
|
|
carlos-- Phone #: ###-####
|