Inspections for the day of: Thursday, August 28, 2008.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01669 BLD-Foundation8/27/20088/28/20088/29/2008 7:38:58 AMAPASS
Mike Phone #: ###-####
BLD08-01127 BLD-Framing/Rough-in8/28/20088/28/20088/28/2008 4:14:31 PMPPART
Scheduled by a contractor via Hello! on 8/28/2008 at 9:29:31 AM. Contact: ###-####. Interior steel stud 7ft. partition walls for new offices in existing portion of bldg. phase 1.
ESC08-00464 Random Inspection8/28/20088/28/20088/28/2008 4:13:21 PMPPASS
Additional controlled enterance to north of project has been done.
BLD08-01420 BLD-Energy code compliance8/28/20088/28/20088/28/2008 3:20:35 PMPPASS
ryan - insulation - please call 20 min prior to inspection Phone #: ###-####
BLD08-01774 BLD-Framing/Rough-in8/28/20088/28/20088/28/2008 2:34:47 PMPPART
Preston Phone #: ###-####. Interior framing is ok. Justify removal of 3rd 4x4 post at canopy support. Provide lever type hardware on door, also a portion of ticket sales needs to be 36" X 36". c/n posted
BLD08-01191 BLD-Final8/26/20088/28/20088/28/2008 1:33:48 PMPPASS
Jay- insp card in drawer of BBQ unit Phone #: ###-####
BLD08-01191 DOC - Permit Finaled8/28/20088/28/20088/28/2008 1:33:31 PMPPASS
ESC08-00654 Site Preparation8/28/20088/28/20088/28/2008 11:58:32 AMAPASS
ESC permit sign posted. Site is clean.
ESC08-00613 Random Inspection8/28/20088/28/20088/28/2008 11:34:45 AMAPASS
ESC permit sign posted. Site is clean.
BLD08-01554 BLD-Foundation8/27/20088/28/20088/28/2008 11:34:19 AMAPASS
Josh Phone #: ###-####. Additional rebar added at 16 oc as previously noted.
ESC08-00357 General Inspection8/28/20088/28/20088/28/2008 11:05:47 AMAPASS
ESC sign posted. Site is clean.
BLD08-00881 BLD-Energy code compliance8/27/20088/28/20088/28/2008 11:05:21 AMAPASS
shallan Phone #: ###-####
BLD08-00472 BLD-Final8/27/20088/28/20088/28/2008 10:54:36 AMAPASS
Tim Phone #: ###-####
BLD08-00472 DOC - Permit Finaled8/28/20088/28/20088/28/2008 10:54:26 AMPPASS
Demo completed. TI is also done.
BLD08-00154 BLD-Final8/27/20088/28/20088/28/2008 10:53:32 AMAPASS
Tim Phone #: ###-####. ok for perm occ.
ESC07-01278 Random Inspection8/28/20088/28/20088/28/2008 10:23:08 AMAPASS
ESC permit sign posted. BMP's ok.
BLD07-02644 BLD-Footing8/27/20088/28/20088/28/2008 10:22:41 AMAPART
jay Phone #: ###-####. wip. Needs to complete install of remaining verts. Reviewed geotech report for subgrade, ok for conc. Noted to Jay that periodoc special insp. is required for verification of mix design and rebar insp.
ESC08-00413 Site Final8/28/20088/28/20088/28/2008 10:21:01 AMAPASS
All work is complete. 70% reveg ok.
BLD08-01000 BLD-Final8/27/20088/28/20088/28/2008 10:20:14 AMAPASS
Brabra Phone #: ###-####
BLD08-01000 DOC - Permit Finaled8/28/20088/28/20088/28/2008 10:20:06 AMPPASS
BLD08-01103 DOC - Permit Finaled8/28/20088/28/20088/28/2008 8:13:19 AMPPASS