ESC09-00160
| General Inspection | 8/24/2009 | 8/28/2009 | 8/28/2009 12:22:23 PM | A | FAIL |
|
|
Correction Notice to RP: 1. Protect all storm drain inlets within the project area with an approved storm drain inlet protection. 2. Provide a sediment a barrier along the stock pile at the south end of project area and also on all grade over 2% slope including the the area where the grade is over the elevation of the hard surfaces. 3. Clean up all hard surfaces ofall sediment and debris. Failure to comply will result in a stop work order. Will be re-inspected on 8/31/09 PM.
|
ESC09-00102
| Site Final | 8/27/2009 | 8/28/2009 | 8/28/2009 11:02:47 AM | A | FAIL |
|
|
Joseph Phone #: ###-#### Site is not stabilized but has only been graded. Bare soil remains.
|