BLD09-01082
| BLD-Framing/Rough-in | 8/27/2009 | 8/28/2009 | 8/28/2009 3:20:15 PM | A | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Bill Waterfield still need to complet fire cualking ok to cove every thing else
|
BLD09-00513
| BLD-Energy code compliance | 8/28/2009 | 8/28/2009 | 8/28/2009 3:14:28 PM | P | NR |
|
|
Dona Phone #: ###-####
|
BLD09-00513
| BLD-Framing/Rough-in | 8/28/2009 | 8/28/2009 | 8/28/2009 3:14:08 PM | P | PART |
|
|
Dona Phone #: ###-#### ok to insulate needs to fire block basement wall and install seal package
|
BLD09-00500
| BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 3:12:46 PM | P | NR |
|
|
Tim Phone #: ###-#### needs zoning final and mec final
|
BLD09-00227
| BLD-Final | 8/28/2009 | 8/28/2009 | 8/28/2009 3:12:12 PM | P | PART |
|
|
Joe Phone #: ###-#### ok but I need letter from mti
|
BLD09-00873
| BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 3:11:26 PM | P | PASS |
|
|
Joe Phone #: ###-#### ok for perm occ
|
MIS09-00161
| Set Bond Amount | 8/28/2009 | 8/28/2009 | 8/28/2009 3:10:28 PM | P | PASS |
|
|
Dale Hope Please call me in the office when you decide so I can get the demo permit going Thanks Darla Phone #: ###-#### set at 3000 dollars
|
BLD09-00468
| BLD-Other | 8/27/2009 | 8/28/2009 | 8/28/2009 3:09:26 PM | P | PASS |
|
|
Rick- ceiling- call 30 mins prior to going for access Phone #: ###-#### ok to cover ceiling
|
GCB09-00001
| GCB-Stem wall | 8/27/2009 | 8/28/2009 | 8/28/2009 11:51:14 AM | A | PASS |
|
|
Mr. Gustafson Phone #: ###-####
|
BLD09-00348
| BLD-Wall cover | 8/27/2009 | 8/28/2009 | 8/28/2009 10:39:24 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/27/2009 at 9:08:07 AM. Contact: ###-####.
|
BLD09-00227
| BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 9:53:19 AM | A | CANC |
|
|
Joe Phone #: ###-####
|
BLD09-00720
| BLD-Final | 8/27/2009 | 8/28/2009 | 8/28/2009 9:50:55 AM | A | NR |
|
|
Ron Phone #: ###-#### needs an elec final first
|
BLD09-01341
| BLD-Foundation | 8/27/2009 | 8/28/2009 | 8/28/2009 7:10:49 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/27/2009 at 1:13:37 PM. Contact: ###-####.
|
GCB09-00012
| GCB-Framing | 8/27/2009 | 8/28/2009 | 8/28/2009 7:02:28 AM | A | PASS |
|
|
call Joe prior to going\NE corner of building by bathroom Phone #: ###-#### ok to cover restroom
|
GCB09-00001
| GCB-Footing | 8/27/2009 | 8/28/2009 | 8/28/2009 7:01:12 AM | A | PASS |
|
|
brent Phone #: ###-#### ok to pour
|