Inspections for the day of: Friday, August 28, 2009.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-02401 FIRE-Final Inspection8/28/20098/28/20098/28/2009 4:10:03 PMPFAIL
Provide the re-arranged main exit hardware and annual inspections for both of the fire extinguishers.
BLD09-00057 FIRE-Final Inspection8/28/20098/28/20098/28/2009 4:08:48 PMPFAIL
Provide approved single action hardware on the two doors as discussed. All other items are ok.
BLD09-00791 FIRE-Final Inspection8/27/20098/28/20098/28/2009 2:29:11 PMAFAIL
All items are passed except the door needs infilled that leads to the next tenant space, the new door installed as well as the chain link fence or plans need to be resubmitted to Sam Zahorka showing changes for approval.
BLD08-01972 FIRE-Conference8/28/20098/28/20098/28/2009 2:19:07 PMPDONE
Per Scott Arlenno and Mark Sentenno a job site meeting with the general contractor was held and the general contractor was notified which areas of the school were ok to occupy and which areas are not ok to occupy.
FIR09-00477 INSP-Final Inspection8/27/20098/28/20098/28/2009 1:47:53 PMPPASS
Permit finaled. Inspection was performed by stephanie cobbley.
BLD07-02196 FIRE-Final Inspection8/27/20098/28/20098/28/2009 12:49:39 PMAPASS
Life safety passed
BLD09-01340 FIRE-Final Inspection8/27/20098/28/20098/28/2009 12:24:33 PMAPART
A temporary occupancy is being given until the two fire extinguishers get the annual inspection tags and the banner is removed from infront of the address.
BLD07-02189 FIRE-Final Inspection8/27/20098/28/20098/28/2009 12:05:06 PMAPASS
Life safety passed
FIR09-00481 INSP-Final Inspection8/26/20098/28/20098/28/2009 11:08:23 AMAPASS
Permit finaled. Inspection performed by stephanie cobbley.
BLD08-02568 FIRE-Final Inspection8/27/20098/28/20098/28/2009 11:07:32 AMAPART
A temporary occupancy was being given with mark sentennos permission until the two missing emergency lights have been installed. All other items are passed. I waited while the sample tubes in the duct detector were installed correctly.
FIR07-01031 INSP-Sprinkler Rough-in8/27/20098/28/20098/28/2009 9:56:18 AMAPASS
See the city approved plans for location with todays date where sprinkler piping is ok to cover.