FIR14-00261
| INSP-Sprinkler Rough-in | 8/27/2014 | 8/28/2014 | 8/28/2014 4:24:03 PM | P | PART |
|
|
OH rough-in at 4th floor units. Noted exposed CPVC at the electrical/mechanical closet.
|
BLD14-02067
| FIRE-Final Inspection | 8/27/2014 | 8/28/2014 | 8/28/2014 4:00:50 PM | P | PASS |
|
|
Previous correction items verified for completion. Life safety passed.
|
FIR14-00502
| INSP-Final Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 3:59:48 PM | P | PASS |
|
|
Fire sprinkler permit work passed final walkthrough.
|
FIR14-00390
| INSP-Final Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 2:09:14 PM | A | PASS |
|
|
Functional testing completed. Fire alarm permit finaled.
|
FIR14-00400
| INSP-Final Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 2:08:26 PM | A | PASS |
|
|
Fire alarm work passed inspection. Permit finaled.
|
FIR14-00451
| INSP-Final Inspection | 8/28/2014 | 8/28/2014 | 8/28/2014 2:07:45 PM | A | PASS |
|
|
Scope of fire alarm work completed and passed inspection.
|
FIR14-00318
| INSP-Sprinkler Rough-in | 8/27/2014 | 8/28/2014 | 8/28/2014 11:48:19 AM | A | PART |
|
|
Okay to cover overhead work at the grid ceiling areas per the scope of remodel. * Noted a new overhead door at the back of warehouse- provide additional sprinkler coverage at this location.
|
BLD14-01001
| FIRE-Final Inspection | 8/27/2014 | 8/28/2014 | 8/28/2014 11:41:33 AM | A | PASS |
|
|
Fire life safety inspection completed acceptable.
|
FIR14-00506
| INSP-Final Inspection | 8/26/2014 | 8/28/2014 | 8/28/2014 11:35:38 AM | A | PASS |
|
|
Scope of fire alarm work passed inspection and functional testing. Permit finaled.
|
FIR14-00615
| INSP-Final Inspection | 8/27/2014 | 8/28/2014 | 8/28/2014 11:34:14 AM | A | PASS |
|
|
Fire sprinkler work passed final walkthrough. Permit finaled.
|
BLD06-02323
| FIRE-Final Inspection | 8/27/2014 | 8/28/2014 | 8/28/2014 11:33:02 AM | A | PART |
|
|
Unit 205 building #2 passed fire life safety final inspection.
|
BLD14-02443
| FIRE-Final Inspection | 8/27/2014 | 8/28/2014 | 8/28/2014 11:31:52 AM | A | PASS |
|
|
Fire life safety passed provided two exit signs are installed per plan review and both fire extinguishers are serviced. Items to be finished prior to structural final as discussed with tenant.
|