ELE14-01182
| Electrical Rough-In | 8/28/2014 | 8/28/2014 | 8/28/2014 2:12:17 PM | P | PASS |
|
|
call Shane 1/2 hour prior .. 2nd floor CH2 elevator lobby Phone #: ###-#### >> Inspection requested via web by Mike Basye. Ok to cover ceiling.
|
ELE14-02095
| Electrical Rough-In | 8/27/2014 | 8/28/2014 | 8/28/2014 1:49:59 PM | P | PART |
|
|
Ryan Phone #: ###-####. Marked on plans. walls ok.
|
ELE14-02383
| Permanent Service | 8/27/2014 | 8/28/2014 | 8/28/2014 1:20:30 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Brandon Blackham. P/S Connect ok. Needs to thread in mast few more threads.Contractor stated he would take care of it before he called in for service. Concrete encased electrode needs to be put in wall or baried in concrete.
|