FIR17-00472
| INSP-Final Inspection | 8/28/2017 | 8/28/2017 | 8/28/2017 2:25:15 PM | P | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Don Kartchner
|
BLD17-02635
| FIRE-Final Inspection | 8/28/2017 | 8/28/2017 | 8/28/2017 1:31:37 PM | P | FAIL |
|
|
Provide annual inspection for the sprinkler system, replace the painted sprinkler heads and painted horn/strobes. Small documents indicated no fire alarms or fire sprinklers. This building is partially sprinklered and fully alarmed.
|
FIR17-00495
| INSP-Final Inspection | 8/25/2017 | 8/28/2017 | 8/28/2017 10:38:20 AM | A | PASS |
|
|
Permit finaled
|
FIR17-00327
| INSP-Sprinkler Rough-in | 8/25/2017 | 8/28/2017 | 8/28/2017 10:38:03 AM | A | PASS |
|
|
Rough-in passed. Piping can be covered.
|
BLD17-01858
| FIRE-Final Inspection | 8/25/2017 | 8/28/2017 | 8/28/2017 8:53:06 AM | A | PASS |
|
|
life safety passed
|
FIR17-00346
| INSP-Final Inspection | 8/25/2017 | 8/28/2017 | 8/28/2017 8:52:46 AM | A | PASS |
|
|
Permit finaled
|