BLD00-01374
| BLD-Footing | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | A | PART |
|
|
ron ###-####
|
BLD00-00286
| BLD-Foundation | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 15:29:35. Contact: . placed with special insp. 8/29/2000 7:54:49 AM
|
BLD00-01726
| BLD-Footing | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 15:50:45. Contact: ###-####. rebar ok pending report from special insp. 8/29/2000 10:12:03 AM
|
BLD00-02290
| BLD-Footing | 8/29/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | PART |
|
|
dane-- ###-#### ft eary start contractors responcablity for compliance upon permit isuance. 8/29/2000 3:03:44 PM
|
BLD00-02455
| BLD-Footing | 8/29/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | PART |
|
|
dane-- ###-#### ft contactors responcablity early start. 8/29/2000 3:06:26 PM
|
BLD00-02003
| BLD-Framing/Rough-in | 8/29/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | PART |
|
|
Royster ###-#### reinspection from Perry corrections 2nd truss from north gable top chord cut to supply repair and be reinsp. befor attic is insulated. c/n left and ok to rock access in truss location at ridge vent. 8/29/2000 3:49:49 PM
|
BLD00-02003
| BLD-Framing/Rough-in | 8/29/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | PART |
|
|
###-####- MURRY R/I
|
BLD00-01563
| BLD-Concrete | 8/23/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/23/2000 at 18:02:47. Contact: ###-####. work 80 % in place appears ok pending report. 8/29/2000 10:12:54 AM
|