BLD00-02169
| BLD-Footing | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | | PART |
|
|
Shelby ###-#### bsmt wip... 8/29/2000 8:42:09 AM
|
BLD00-00887
| BLD-Framing/Rough-in | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | A | PART |
|
|
reinspection dean ###-####
|
BLD00-02359
| BLD-Framing/Rough-in | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 22:09:48. Contact: ###-####.
|
BLD00-01605
| BLD-Energy code compliance | 8/29/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | PART |
|
|
###-####; chk r 19 floor at final 8/29/2000 11:32:44 AM
|
BLD00-01957
| BLD-Final | 8/29/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | FAIL |
|
|
FN OCC-- FOR HOMEOWNER BONNIE-- ###-#### CALL 1ST BEFORE INSP; need other finals 8/29/2000 4:45:49 PM
|
BLD00-01138
| BLD-Energy code compliance | 8/29/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | PART |
|
|
Viehweg ###-####; frame c/n ok; ok to cover after complete vapor barrier 8/29/2000 1:01:20 PM
|
BLD00-02177
| BLD-Other | 8/29/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 08/29/2000 at 09:08:41. Contact: ###-####.ceiling grid...c/n on frame ok, plans onsite 8/29/2000 2:26:13 PM
|
BLD00-02357
| BLD-Footing | 8/29/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | FAIL |
|
|
GERRAD- ###-#### FT
|
BLD00-00398
| BLD-Final | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | FAIL |
|
|
DON-- ###-#### FN OCC...c/n, driveway , etc.8/29/2000 4:03:29 PM 8/29/2000 4:03:39 PM 8/29/2000 4:04:28 PM
|
BLD00-01865
| BLD-Framing/Rough-in | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | PART |
|
|
JIM-- ###-#### FR INSP ok to roof at soffit 8/29/2000 12:51:35 PM
|