Inspections for the day of: Tuesday, August 29, 2000.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02169 BLD-Footing8/28/20008/29/20008/29/2000 12:00:00 AM PART
Shelby ###-#### bsmt wip... 8/29/2000 8:42:09 AM
BLD00-00887 BLD-Framing/Rough-in8/28/20008/29/20008/29/2000 12:00:00 AMAPART
reinspection dean ###-####
BLD00-02359 BLD-Framing/Rough-in8/28/20008/29/20008/29/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/28/2000 at 22:09:48. Contact: ###-####.
BLD00-01605 BLD-Energy code compliance8/29/20008/29/20008/29/2000 12:00:00 AMPPART
###-####; chk r 19 floor at final 8/29/2000 11:32:44 AM
BLD00-01957 BLD-Final8/29/20008/29/20008/29/2000 12:00:00 AMPFAIL
FN OCC-- FOR HOMEOWNER BONNIE-- ###-#### CALL 1ST BEFORE INSP; need other finals 8/29/2000 4:45:49 PM
BLD00-01138 BLD-Energy code compliance8/29/20008/29/20008/29/2000 12:00:00 AMPPART
Viehweg ###-####; frame c/n ok; ok to cover after complete vapor barrier 8/29/2000 1:01:20 PM
BLD00-02177 BLD-Other8/29/20008/29/20008/29/2000 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 08/29/2000 at 09:08:41. Contact: ###-####.ceiling grid...c/n on frame ok, plans onsite 8/29/2000 2:26:13 PM
BLD00-02357 BLD-Footing8/29/20008/29/20008/29/2000 12:00:00 AMPFAIL
GERRAD- ###-#### FT
BLD00-00398 BLD-Final8/28/20008/29/20008/29/2000 12:00:00 AMPFAIL
DON-- ###-#### FN OCC...c/n, driveway , etc.8/29/2000 4:03:29 PM 8/29/2000 4:03:39 PM 8/29/2000 4:04:28 PM
BLD00-01865 BLD-Framing/Rough-in8/28/20008/29/20008/29/2000 12:00:00 AMPPART
JIM-- ###-#### FR INSP ok to roof at soffit 8/29/2000 12:51:35 PM