BLD00-01552
| FIRE-Sprinkler Rough-in | 8/28/2000 | 8/29/2000 | 8/30/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 08/28/2000 at 11:57:35. Contact: ###-####. tenting required prior to cover 8/30/2000 11:11:40 AM
|
BLD00-01374
| FIRE-Sprinkler Rough-in | 8/29/2000 | 8/29/2000 | 8/30/2000 12:00:00 AM | P | FAIL |
|
|
underground test David ###-#### left c/n - plans not submitted 8/30/2000 9:30:53 AM
|
BLD99-01722
| FIRE-Final Inspection | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | A | FAIL |
|
|
FRANK-- ###-#### FIRE FN alarms not working in all areas 8/29/2000 12:13:05 PM
|
BLD00-02005
| FIRE-Final Inspection | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | A | PASS |
|
|
John ###-####
|
BLD00-01762
| FIRE-Final Inspection | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | A | PASS |
|
|
bill--###-#### fire fn
|
BLD99-03287
| FIRE-Final Inspection | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | NR |
|
|
Skip Jones ###-#### rescheduled for 8/30 8/29/2000 12:10:42 PM
|
FIR00-00275
| INSP-Supply line flush | 8/28/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | PASS |
|
|
CHRIS-- CELL ###-#### SUPPLY LINE flush okay 8/29/2000 12:12:20 PM
|
BLD99-01722
| FIRE-Final Inspection | 8/29/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by Inspector: 409 On 8/29/2000 alarms not working right 8/30/2000 8:14:20 AM
|
FIR00-00454
| INSP-Final Inspection | 8/15/2000 | 8/29/2000 | 8/29/2000 12:00:00 AM | P | NR |
|
|
TIM --###-#### FIRE FN--CALL 1ST BEFORE INSP will reschedule for 8/30 8/30/2000 8:13:50 AM
|