Inspections for the day of: Wednesday, August 29, 2001.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00663 BLD-Aging Inspection8/29/20018/29/20018/29/2001 12:00:00 AM PASS
ok for final if all others are signed off for perm. 8/30/2001 10:23:48 AM
BLD01-00753 BLD-Aging Inspection8/29/20018/29/20018/29/2001 12:00:00 AM PASS
corridor and ceilling work in progess walk through ok 8/31/2001 9:59:53 AM
BLD01-01039 BLD-Aging Inspection8/29/20018/29/20018/29/2001 12:00:00 AM FAIL
no call 8/31/2001 8:07:08 AM
BLD01-00623 BLD-Aging Inspection8/29/20018/29/20018/29/2001 12:00:00 AM PASS
tanks being set work in progess 8/31/2001 9:59:06 AM
BLD01-00247 BLD-Aging Inspection8/29/20018/29/20018/29/2001 12:00:00 AM FAIL
left phone measage no return call reiceved / work appears to have been abandoned. 9/5/2001 8:04:46 AM
BLD01-00335 BLD-Aging Inspection8/29/20018/29/20018/29/2001 12:00:00 AM FAIL
no call 8/31/2001 8:06:01 AM
BLD01-00634 BLD-Aging Inspection8/29/20018/29/20018/29/2001 12:00:00 AM FAIL
no call 8/31/2001 8:07:57 AM
BLD01-01454 BLD-Aging Inspection8/29/20018/29/20018/29/2001 12:00:00 AM FAIL
no call 8/31/2001 8:06:37 AM
BLD01-01450 BLD-Aging Inspection8/29/20018/29/20018/29/2001 12:00:00 AM FAIL
no call 8/31/2001 8:05:22 AM
BLD00-01894 BLD-Foundation8/27/20018/29/20018/29/2001 12:00:00 AMAPART
harry ###-#### placedwith special insp. pending report. 8/29/2001 10:35:20 AM
MEC01-02577 Rough-in8/28/20018/29/20018/29/2001 12:00:00 AMAPASS
R/I TODD ###-####
MEC01-02503 Rough-in8/28/20018/29/20018/29/2001 12:00:00 AMANR
RE-INSP R/I TODD ###-####
BLD01-01855 BLD-Framing/Rough-in8/28/20018/29/20018/29/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/28/2001 at 13:03:17. Contact: ###-####. saftey glazing top of stairs and 24 of 2nd floor door. seal attic ele boxes.sheer interior walls per plan. 8/29/2001 9:26:30 AM
BLD01-01442 BLD-Framing/Rough-in8/28/20018/29/20018/29/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 08/28/2001 at 13:06:01. Contact: ###-####.
BLD01-00445 BLD-Footing8/28/20018/29/20018/29/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 08/28/2001 at 13:43:36. Contact: ###-####. mat rebar ok special insp. to be on site. 8/29/2001 9:57:30 AM
BLD01-02128 BLD-Final8/28/20018/29/20018/29/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 08/28/2001 at 19:18:15. Contact: ###-####.
BLD01-01181 BLD-Concrete8/28/20018/29/20018/29/2001 12:00:00 AMPPASS
###-#### MIKE ft at col. special insp. / reviewed roof erection in process tilt panels weld and back pour ok for cover/ recieved engineer office beam modifaction approved and archived to city. 8/30/2001 9:10:12 AM
BLD01-00562 BLD-Framing/Rough-in8/28/20018/29/20018/29/2001 12:00:00 AMPPASS
###-#### SUSAN mech fail. area not concealed ok to insulate.8/29/2001 4:16:53 PM 8/29/2001 4:45:04 PM
BLD01-01099 BLD-Framing/Rough-in8/29/20018/29/20018/29/2001 12:00:00 AMPPASS
###-#### shear sheer ok 8/29/2001 3:06:39 PM
BLD01-01820 BLD-Final8/29/20018/29/20018/29/2001 12:00:00 AMPPASS
john ###-#### fn final ok card on site. 8/30/2001 10:44:11 AM
BLD01-01442 BLD-Framing/Rough-in8/29/20018/29/20018/29/2001 12:00:00 AMPPART
travis ###-#### ( please call framer before going out steve ###-####) framing made ok /ok to insulate upon mech approval. 8/29/2001 5:11:14 PM
BLD01-00986 BLD-Foundation8/29/20018/29/20018/29/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/29/2001 at 10:51:00. Contact: ###-####.
BLD01-00986 BLD-Foundation8/29/20018/29/20018/29/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 08/29/2001 at 10:51:00. Contact: ###-####.
MIS01-00177 BLD-Conference8/29/20018/29/20018/29/2001 12:00:00 AMPPASS
Complaint of construction within 100 yr floodplain.