BLD01-01447
| BLD-Aging Inspection | 8/29/2001 | 8/29/2001 | 8/29/2001 12:00:00 AM | | NR |
|
|
reroof, no call 8/29/2001 8:14:25 AM
|
BLD00-01649
| BLD-Framing/Rough-in | 8/27/2001 | 8/29/2001 | 8/29/2001 12:00:00 AM | A | PART |
|
|
MEL-- ###-#### FR still need gyp assy details ; walk thru, WIP 8/30/2001 3:54:25 PM
|
BLD01-00594
| BLD-Framing/Rough-in | 8/28/2001 | 8/29/2001 | 8/29/2001 12:00:00 AM | A | FAIL |
|
|
###-#### drywall; need stamped detail/fix as req'd for shear walls , ok to pre rock at tubs8/29/2001 1:21:05 PM 8/29/2001 1:21:58 PM
|
BLD01-00921
| BLD-Framing/Rough-in | 8/28/2001 | 8/29/2001 | 8/29/2001 12:00:00 AM | A | PART |
|
|
###-####; joisting at ramp ok; 1: 20 slope 8/29/2001 11:49:57 AM 8/29/2001 11:50:16 AM
|
BLD01-01492
| BLD-Final | 8/28/2001 | 8/29/2001 | 8/29/2001 12:00:00 AM | P | PART |
|
|
###-####; keep c/n re ADA & other finals, ok for t/o per Tim Hogland 8/29/2001 1:24:54 PM
|
BLD01-01488
| BLD-Final | 8/28/2001 | 8/29/2001 | 8/29/2001 12:00:00 AM | P | PASS |
|
|
gene 360/269/7736 fn ok to sign at office for l/c, card not onsite. 8/29/2001 5:36:37 PM
|
BLD01-01407
| BLD-Framing/Rough-in | 8/29/2001 | 8/29/2001 | 8/29/2001 12:00:00 AM | P | FAIL |
|
|
sheer wall and fraiming ###-#### doug; 2 pg c/n re nailing, energy, trusses, headers, blocking ,etc...no insul. 8/29/2001 5:36:05 PM
|
BLD01-01296
| BLD-Conference | 8/29/2001 | 8/29/2001 | 8/29/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 8/29/2001 12:46:14 PM w/ supt re insp, keep c/n, recall.
|
BLD01-01492
| BLD-Conference | 8/29/2001 | 8/29/2001 | 8/29/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 8/29/2001 1:23:26 PM w Tim h...ok for t/o
|