Inspections for the day of: Wednesday, August 29, 2001.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJoe Tawney
TitleFIRE INSPECTOR
Phone #340-1295
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR01-00387 INSP-Supply line flush8/28/20018/29/20018/29/2001 12:00:00 AMAPART
OK to cover supply line. Still need to pour thrust block at riser 8/29/2001 10:21:28 AM
BLD01-01488 FIRE-Final Inspection8/28/20018/29/20018/29/2001 12:00:00 AMAPASS
Final OKi for certificate of completion 8/29/2001 11:28:19 AM
BLD01-00739 FIRE-Final Inspection8/28/20018/29/20018/29/2001 12:00:00 AMANR
Final Not ready. Work not completed 8/29/2001 10:58:06 AM
FIR01-00275 INSP-Final Inspection8/28/20018/29/20018/29/2001 12:00:00 AMPFAIL
REinsp Fail Supr one detector. Map of AHU locations 8/29/2001 4:40:02 PM
BLD01-01651 FIRE-Final Inspection8/28/20018/29/20018/29/2001 12:00:00 AMPPASS
Reinsp OK for permanant occupancy 8/29/2001 11:30:19 AM
BLD00-03691 FIRE-Final Inspection8/29/20018/29/20018/29/2001 12:00:00 AMPPART
###-#### OK on Fire alarm test FIR00-00112 8/29/2001 3:31:39 PM
BLD01-00588 FIRE-Final Inspection8/29/20018/29/20018/29/2001 12:00:00 AMPFAIL
Reinsp Fail C/N issued 8/29/2001 2:07:39 PM
FIR01-00276 INSP-Sprinkler Rough-in/Hydro8/29/20018/29/20018/29/2001 12:00:00 AMPPART
Added by Inspector: 406 On 8/29/2001 4:57:52 PM Spklr rough was done 6/19/01 and was OK