BLD02-01674
| BLD-Footing | 8/28/2002 | 8/29/2002 | 8/29/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 12:23:06. Contact: ###-####...isolated ftgs for mezzanine in bsmt...ok 8/29/2002 4:13:47 PM
|
BLD01-02239
| BLD-Conference | 8/28/2002 | 8/29/2002 | 8/29/2002 12:00:00 AM | A | PASS |
|
|
for Carl...issue SWO (& also for 712 8th St....converting garage to tenant laundry room at 8th St.) didnt locate work at 712 8th, swo issued for Fort st... 8/29/2002 5:56:07 PM
|
BLD01-00882
| BLD-Conference | 8/28/2002 | 8/29/2002 | 8/29/2002 12:00:00 AM | A | PASS |
|
|
###-#### OR ###-#### ERIC...change steps to meet code...add headroom. 8/29/2002 6:09:59 PM
|
BLD02-01762
| BLD-Conference | 8/28/2002 | 8/29/2002 | 8/29/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 08/28/2002 at 16:16:13. Contact: ###-####...spoke w/ Bldr...need min. size landing & threshold at entry, install handrails at ramp/stairs...etc. 8/29/2002 5:10:15 PM
|
BLD02-00527
| BLD-Final | 8/28/2002 | 8/29/2002 | 8/29/2002 12:00:00 AM | P | NR |
|
|
PARTIAL, called , still need hvac final for units to be finalled. 8/29/2002 4:55:08 PM
|
BLD02-00967
| BLD-Framing/Rough-in | 8/28/2002 | 8/29/2002 | 8/29/2002 12:00:00 AM | P | PART |
|
|
corridor wall ok,chk firestops at final 8/29/2002 6:08:55 PM
|
BLD01-00011
| BLD-Conference | 8/28/2002 | 8/29/2002 | 8/29/2002 12:00:00 AM | P | PASS |
|
|
Re flood plain cert...not approved per J Wylie, Need flood base elevation #'s; told bldr, he'll advise...keep c/n...ok to use as this is parking structure. 8/29/2002 6:06:32 PM
|