FIR03-00187
| INSP-Final Inspection | 8/26/2003 | 8/26/2003 | | A | |
|
|
|
FIR03-00155
| FIR-Aging Inspection | 8/29/2003 | 8/29/2003 | 8/29/2003 12:00:00 AM | | PASS |
|
|
this building is still under construction 8/29/2003 9:50:20 AM
|
BLD03-01681
| FIRE-Final Inspection | 8/27/2003 | 8/29/2003 | 8/29/2003 12:00:00 AM | A | FAIL |
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marc Lileks the east half of the building is not used by this tenant but may be used in the future and the exit system in this area must have exit signs/emergency lighting as it is not separated from the west half; exit doors to openable from the inside without special knowledge; air handler systems over 2000 cfm to have detectors for unit shutdown per plan review notes and will be installed per UMC 608 as no new mechanical work was part of this permit 8/29/2003 9:54:38 AM
|
BLD03-01324
| FIRE-Conference | 8/29/2003 | 8/29/2003 | 8/29/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 8/29/2003 at 12:46:40 AM. Contact: ###-####. Troy did the inspection and it is okay to cover areas per conversation with GC 8/29/2003 3:48:52 PM
|
BLD03-01568
| FIRE-Final Inspection | 8/28/2003 | 8/29/2003 | 8/29/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/28/2003 at 3:46:36 PM. Contact: ###-####. will have the key lock removed from double door for structrual inspector; detectors okay for AHU shutdown 8/29/2003 1:43:37 PM
|
FIR03-00454
| INSP-Sprinkler Rough-in/Hydro | 8/29/2003 | 8/29/2003 | 8/29/2003 12:00:00 AM | P | PART |
|
|
rick pager; Phone #: ###-#### Internet Inspection Request from: Marc Lileks packing room hydro and rough-in okay; PIV requires monitoring by fire alarm system 8/29/2003 2:36:32 PM
|
BLD03-01845
| FIRE-Conference | 8/29/2003 | 8/29/2003 | 8/29/2003 12:00:00 AM | P | DONE |
|
|
left correction notice at job site - need smoke detector above panel, manual pull station and audible alarm; the PIV is not monitored by the fire alarm panel 8/29/2003 3:06:49 PM
|