Inspections for the day of: Monday, August 29, 2005.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-02871 Electrical Rough-In8/24/20058/29/20058/29/2005 5:45:56 PMPNR
after 2pm please///john; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa left note for them to call for an appointment. called phone number not good phone number at 5:30pm john oliver the owner called. i ask him if he did the wiring he said a friend did it. told him he would have to get a electrical contractor to get a permit & do the wiring. he said okay.
ELE05-03140 Electrical Rough-In8/29/20058/29/20058/29/2005 4:04:22 PMPFAIL
Wall cover inspection please////steve ###-#### strapping for emt, flex conduit & mc cable not completed.
ELE05-03025 Permanent Service8/29/20058/29/20058/29/2005 4:02:48 PMPNR
###-#### - scott conf with home owner need romex connector not a 2inch nipple. grounding ok & sub panal not completed.
ELE05-03144 Final8/29/20058/29/20058/29/2005 3:58:28 PMPNR
please call first to meet//pat ###-#### conf with regarding classifcation area
ELE05-01718 Electrical Rough-In8/29/20058/29/20058/29/2005 3:56:54 PMPPART
Scheduled by a contractor via Hello! on 8/29/2005 at 10:59:21 AM. Contact: ###-####. conf with tony regarding working clearances
ELE05-02145 Electrical Rough-In8/29/20058/29/20058/29/2005 2:52:31 PMPPART
###-#### - warren ok cover conduit under slab office area & cover conduit to transformer
ELE05-02926 Final8/26/20058/29/20058/29/2005 10:06:39 AMAPASS
lloyd ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok final
ELE05-02141 Final8/25/20058/29/20058/29/2005 9:52:40 AMAPASS
Final inspection of clean room tool in bay 9.; Phone #: ###-#### Internet Inspection Request from: Del Elwood ok final
ELE05-02454 Final8/25/20058/29/20058/29/2005 9:52:12 AMAPASS
Final bld.2 equipment room remodel. Del Elwood; Phone #: ###-#### ok final
ELE05-02519 Final8/25/20058/29/20058/29/2005 9:51:45 AMAPASS
Mike, This is a Fab Tool. SUP 05 Internet Inspection Request from: Ken Heller ok final
ELE04-03788 Final8/25/20058/29/20058/29/2005 9:51:05 AMAPART
Scheduled by a contractor via Hello! on 8/25/2005 at 1:43:08 PM. Contact: ###-####. not completed transformer grounging, makeup mirror cab., & cappel lighting energized.
ELE05-02278 ELE-Aging Inspection8/29/20058/29/20058/29/2005 7:49:57 AM NR
suc