BLD06-00658
| BLD-Energy code compliance | 8/28/2006 | 8/29/2006 | 8/29/2006 4:56:06 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/28/2006 at 1:13:15 PM. Contact: ###-####.
|
BLD06-01769
| BLD-Foundation | 8/28/2006 | 8/29/2006 | 8/29/2006 4:51:31 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 8/28/2006 at 1:49:59 PM. Contact: ###-####.
|
BLD05-00453
| BLD-Framing/Rough-in | 8/29/2006 | 8/29/2006 | 8/29/2006 4:42:03 PM | P | NR |
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley Plumbers need to provide listed assemblies for penitrations.....HVAC same for conden. lines
|
BLD06-01088
| BLD-Final | 8/29/2006 | 8/29/2006 | 8/29/2006 4:11:43 PM | P | NR |
|
|
jeff; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley Need HVAC and Zoning to sign off.......Called left message.
|
BLD06-01889
| BLD-Energy code compliance | 8/28/2006 | 8/29/2006 | 8/29/2006 2:22:58 PM | P | PASS |
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD06-01161
| BLD-Energy code compliance | 8/28/2006 | 8/29/2006 | 8/29/2006 12:47:05 PM | A | PASS |
|
|
cole; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD06-02262
| BLD-Final | 8/28/2006 | 8/29/2006 | 8/29/2006 12:08:49 PM | P | PASS |
|
|
###-#### billy -call 1/2 hr prior to insp
|
BLD06-02262
| DOC - Permit Finaled | 8/29/2006 | 8/29/2006 | 8/29/2006 12:08:39 PM | P | PASS |
|
|
|
BLD06-00289
| BLD-Final | 8/28/2006 | 8/29/2006 | 8/29/2006 11:55:31 AM | A | PART |
|
|
Mike : ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt Frame and Energy OK.......OK to Final when Electrical finals.
|
BLD03-00804
| BLD-Final | 8/28/2006 | 8/29/2006 | 8/29/2006 8:30:38 AM | A | PASS |
|
|
doug; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
Plumb consists of (1) floor drain into small french system......No permit OK No HVAC.... Electr. space heater installed.
|