Inspections for the day of: Tuesday, August 29, 2006.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-00658 BLD-Energy code compliance8/28/20068/29/20068/29/2006 4:56:06 PMPPASS
Scheduled by a contractor via Hello! on 8/28/2006 at 1:13:15 PM. Contact: ###-####.
BLD06-01769 BLD-Foundation8/28/20068/29/20068/29/2006 4:51:31 PMPPASS
Scheduled by a contractor via Hello! on 8/28/2006 at 1:49:59 PM. Contact: ###-####.
BLD05-00453 BLD-Framing/Rough-in8/29/20068/29/20068/29/2006 4:42:03 PMPNR
justin; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
Plumbers need to provide listed assemblies for penitrations.....HVAC same for conden. lines

BLD06-01088 BLD-Final8/29/20068/29/20068/29/2006 4:11:43 PMPNR
jeff; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
Need HVAC and Zoning to sign off.......Called left message.
BLD06-01889 BLD-Energy code compliance8/28/20068/29/20068/29/2006 2:22:58 PMPPASS
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD06-01161 BLD-Energy code compliance8/28/20068/29/20068/29/2006 12:47:05 PMAPASS
cole; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD06-02262 BLD-Final8/28/20068/29/20068/29/2006 12:08:49 PMPPASS
###-#### billy -call 1/2 hr prior to insp
BLD06-02262 DOC - Permit Finaled8/29/20068/29/20068/29/2006 12:08:39 PMPPASS
BLD06-00289 BLD-Final8/28/20068/29/20068/29/2006 11:55:31 AMAPART
Mike : ); Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
Frame and Energy OK.......OK to Final when Electrical finals.
BLD03-00804 BLD-Final8/28/20068/29/20068/29/2006 8:30:38 AMAPASS
doug; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley

Plumb consists of (1) floor drain into small french system......No permit OK No HVAC.... Electr. space heater installed.