BLD05-00087
| BLD-Conference | 8/28/2006 | 8/29/2006 | 9/1/2006 4:32:15 PM | A | CANC |
|
|
Discuss engineering and special inspection requirements with general contractor and trades.
|
MIS06-00157
| DOC - Permit Finaled | 8/29/2006 | 8/29/2006 | 8/29/2006 3:55:15 PM | P | PASS |
|
|
|
BLD06-00839
| BLD-Conference | 8/28/2006 | 8/29/2006 | 8/29/2006 12:11:03 PM | A | PART |
|
|
Review hold down and joist questions. Please call before arriving at location so I can be there. Thanks. Jim ; Phone #: ###-#### Internet Inspection Request from: Jim Ritter make hold downs work the best you can,, fill in full studs as needed,,,, joist cuts,, fill w/ plywood in webs, glue nail/screw ok
|
BLD06-01420
| BLD-Framing/Rough-in | 8/28/2006 | 8/29/2006 | 8/29/2006 11:59:43 AM | A | PART |
|
|
marc; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley verify seal pack, fireblocks,, ok to insulate
|
BLD06-00340
| BLD-Final | 8/28/2006 | 8/29/2006 | 8/29/2006 10:52:29 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/28/2006 at 4:43:39 PM. Contact: ###-####.
|
BLD06-00340
| DOC - Permit Finaled | 8/29/2006 | 8/29/2006 | 8/29/2006 10:52:19 AM | P | PASS |
|
|
C OF O ISSUED
|
BLD06-00350
| BLD-Final | 8/28/2006 | 8/29/2006 | 8/29/2006 10:51:58 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 8/28/2006 at 4:45:18 PM. Contact: ###-####.
|
BLD06-00350
| DOC - Permit Finaled | 8/29/2006 | 8/29/2006 | 8/29/2006 10:51:48 AM | P | PASS |
|
|
C OF O ISSUED
|
BLD05-02349
| BLD-Final | 8/28/2006 | 8/29/2006 | 8/29/2006 9:58:16 AM | A | PASS |
|
|
###-#### - chad Note: before 9:30 if possible - he would like to talk to the inspector
|
BLD05-02349
| DOC - Permit Finaled | 8/29/2006 | 8/29/2006 | 8/29/2006 9:57:24 AM | P | PASS |
|
|
|