Inspections for the day of: Friday, August 29, 2008.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01575 BLD-Footing8/28/20088/29/20088/29/2008 5:08:38 PMPPASS
paul Phone #: ###-####
BLD08-00831 BLD-Final8/29/20088/29/20088/29/2008 3:12:53 PMPPASS
BLD08-00831 DOC - Permit Finaled8/29/20088/29/20088/29/2008 3:12:35 PMPPASS
BLD08-00813 BLD-Energy code compliance8/29/20088/29/20088/29/2008 3:08:17 PMPPASS
mitch Phone #: ###-####
BLD08-01792 BLD-Foundation8/29/20088/29/20088/29/2008 2:54:22 PMPPASS
Scheduled by a contractor via Hello! on 8/29/2008 at 7:33:33 AM. Contact: ###-####.
BLD08-00360 BLD-Final8/29/20088/29/20088/29/2008 2:53:56 PMPPASS
Phone #: ###-####
OK for Perm Occ.
BLD08-00512 BLD-Final8/29/20088/29/20088/29/2008 1:50:15 PMPFAIL
dave Phone #: ###-####
C/N posted...... Note......Plumbing on Temp....
ESC08-00432 Site Final8/29/20088/29/20088/29/2008 1:47:43 PMPFAIL
Justin Hubble
C/N Need Min 70% Re-vegitation Stabilize all denuded soils.
BLD07-03079 BLD-Framing/Rough-in8/28/20088/29/20088/29/2008 12:07:24 PMAPART
Joe Phone #: ###-####
Fire Riser room.....OK... (behind Thursdays).
BLD08-01830 BLD-Framing/Rough-in8/28/20088/29/20088/29/2008 11:31:34 AMAPASS
dustin Phone #: ###-####
BLD08-01042 BLD-Final8/28/20088/29/20088/29/2008 11:24:12 AMAFAIL
Scheduled by a contractor via Hello! on 8/28/2008 at 3:10:19 PM. Contact: ###-####.
Need final on ESC...... C/N 70 % revegitation Stabilize soils
BLD08-00813 BLD-Energy code compliance8/28/20088/29/20088/29/2008 10:38:56 AMANR
mitch- late AM Phone #: ###-####
BLD08-01439 BLD-Final8/28/20088/29/20088/29/2008 10:32:33 AMPCANC
matt Phone #: ###-#### Inspection cancelled from web by: Alexandra Rahn
BLD08-01792 BLD-Foundation8/29/20088/29/20088/29/2008 9:34:57 AMAPASS
Scheduled by a contractor via Hello! on 8/29/2008 at 6:41:29 AM. Contact: ###-####.