Inspections for the day of: Friday, August 29, 2008.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02047 BLD-Energy code compliance8/29/20088/29/20088/29/2008 3:49:06 PMPPASS
marty Phone #: ###-####
BLD06-02048 BLD-Energy code compliance8/29/20088/29/20088/29/2008 3:49:00 PMPPASS
marty Phone #: ###-####
ESC08-00693 Site Preparation8/29/20088/29/20088/29/2008 3:48:53 PMPPART
ESC permit sign posted. Site looked ok.
BLD08-01789 BLD-Foundation8/29/20088/29/20088/29/2008 3:48:27 PMPPART
Jared- wall Phone #: ###-####
BLD08-01163 BLD-Final8/29/20088/29/20088/29/2008 3:12:45 PMPPASS
Robert- call 30 min prior for access Phone #: ###-####
BLD08-01163 DOC - Permit Finaled8/29/20088/29/20088/29/2008 3:12:36 PMPPASS
BLD07-01201 DOC - Permit Finaled8/29/20088/29/20088/29/2008 3:00:50 PMPPASS
BLD07-01201 BLD-Final8/29/20088/29/20088/29/2008 3:00:41 PMPPASS
Matt Phone #: ###-####
BLD08-00680 BLD-Footing8/29/20088/29/20088/29/2008 1:04:02 PMPCANC
Phone #: ###-####
ESC06-01309 Random Inspection8/29/20088/29/20088/29/2008 12:23:29 PMAPASS
ESC permit signs posted at controlled entry points. General site conditions looked good. Also noted that contractor has been employing dust control measures on a regular basis through out the day.
BLD06-02320 BLD-Conference8/28/20088/29/20088/29/2008 12:21:20 PMADONE
Look at the 4th floor ceiling in bldg 3 for pre-rock. Phone #: ###-#### Internet Inspection Request from: Bob Thornton. Contractor wants to change termination piont of refuse chute. Wants to terminate at 4th floor ceiling instead of continueing thru roof deck. Noted to contractor to have architect submit new detail to plan review for approval.
BLD06-02320 BLD-Framing/Rough-in8/29/20088/29/20088/29/2008 12:18:55 PMAPART
Look at the 4th floor ceiling in bldg 3 for pre-rock. Phone #: ###-#### Internet Inspection Request from: Bob Thornton. ok to pre rock 4th floor corridor flat ceiling areas only.
BLD07-00996 BLD-Final8/28/20088/29/20088/29/2008 11:20:56 AMAPASS
ryan walker Phone #: ###-####-- call 1st before insp for access. cert. of occ. issued.
BLD07-00996 DOC - Permit Finaled8/29/20088/29/20088/29/2008 11:20:36 AMPPASS
ESC08-00490 Random Inspection8/29/20088/29/20088/29/2008 10:44:39 AMAPART
General site conditions looked good. ESC permit sign was posted. Noted adtional work on roadway adjacent to project, Needs to sweep trackout.
BLD08-01210 BLD-Foundation8/29/20088/29/20088/29/2008 10:41:29 AMAPART
dale- ###-####. INterior column pad footings.
BLD08-01788 BLD-Foundation8/28/20088/29/20088/29/2008 10:28:28 AMAPART
Scheduled by a contractor via Hello! on 8/28/2008 at 8:40:19 AM. Contact: ###-####.
ESC08-00694 Site Preparation8/29/20088/29/20088/29/2008 10:28:10 AMAPASS
ESC permit sign posted. Site clean.
ESC08-00084 Random Inspection8/29/20088/29/20088/29/2008 10:15:54 AMAPASS
Site is clean,.
BLD08-00234 BLD-Other8/28/20088/29/20088/29/2008 10:13:47 AMAPART
Scheduled by a contractor via Hello! on 8/28/2008 at 1:47:12 PM. Contact: ###-####. Inspected nailing for roof diaphragm and verified required straps between gris 1-7 and a-b
BLD08-01786 BLD-Framing/Rough-in8/28/20088/29/20088/29/2008 9:40:57 AMAPART
rick Phone #: ###-####. Framing for store front. Needs to provide welder certs, pull elec permit and get ri insp. Base plates for security gate structure not per plan, provide justification. c/n posted.
BLD08-01055 BLD-Other8/28/20088/29/20088/29/2008 9:24:54 AMAPART
Scheduled by a contractor via Hello! on 8/28/2008 at 8:20:09 AM. Contact: ###-####. framing for hardlids on eas and west ends of store. Center section not ready . Pending elc. and mech. ri insp.
BLD08-01168 BLD-Framing/Rough-in8/29/20088/29/20088/29/2008 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 8/29/2008 at 6:59:16 AM. Contact: ###-####.