ELE11-00557
| Electrical Rough-In | 8/29/2011 | 8/29/2011 | 8/29/2011 3:18:55 PM | P | PASS |
|
|
Contact is Deeon Martineau ###-#### - cover inspection. Phone #: ###-#### >> Inspection requested via web by Scott Campbell ok cover u/g for hv supply, east side
|
ELE11-01929
| Electrical Rough-In | 8/26/2011 | 8/29/2011 | 8/29/2011 3:18:08 PM | P | PASS |
|
|
Would like to get an site underground inspection. Contact on Site Jarod Murray ###-####. Phone #: ###-#### >> Inspection requested via web by Kevin Perez ok cover u/g to new building
|
ELE11-01992
| Electrical Rough-In | 8/29/2011 | 8/29/2011 | 8/29/2011 1:30:24 PM | P | PASS |
|
|
Someone should be there all day Phone #: ###-#### >> Inspection requested via web by Shaun Kirkman ri ok
|
ELE11-01989
| Permanent Service | 8/29/2011 | 8/29/2011 | 8/29/2011 12:29:11 PM | P | FAIL |
|
|
Power off over 1 year Phone #: ###-#### >> Inspection requested via web by Dan Rohl met electrican, shall provide workspace about equipment, abrasion protection for conductors entering enclosure, water pipe ground
|
ELE11-01032
| Electrical Rough-In | 8/28/2011 | 8/29/2011 | 8/29/2011 10:24:05 AM | A | PASS |
|
|
we are now ready for ceiling cover Phone #: ###-#### >> Inspection requested via web by Don Lustig corrections made ok cover ceiling
|
ELE11-01816
| Final | 8/23/2011 | 8/29/2011 | 8/29/2011 10:02:36 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Randy Fletcher ok final
|
ELE11-01949
| Final | 8/28/2011 | 8/29/2011 | 8/29/2011 8:45:21 AM | A | FAIL |
|
|
need inspection on panel in shop Phone #: ###-#### >> Inspection requested via web by TRAVIS WARFIELD called, shall provide 4th wire to sub-panel, ground pull box, size pull box per NEC 314, rest ok
|