PLM11-02031
| Plumbing Rough-in | 8/29/2012 | 8/29/2012 | 8/29/2012 3:21:51 PM | P | PART |
|
|
if questions please call Gary @ ###-#### Phone #: ###-#### >> Inspection requested via web by Stacia Haumann-2-sinks in nurses station pass.
|
MEC12-02974
| Final | 8/29/2012 | 8/29/2012 | 8/29/2012 3:16:24 PM | P | NR |
|
|
As late as possible please, thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas
|
MEC12-03005
| Final | 8/29/2012 | 8/29/2012 | 8/29/2012 2:41:58 PM | P | PASS |
|
|
Late afternoon please. Thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas
|
MEC12-03012
| Pressure Test | 8/29/2012 | 8/29/2012 | 8/29/2012 2:16:54 PM | P | PASS |
|
|
20 lb gas test pass.
|
PLM12-00861
| Plumbing Rough-in | 8/24/2012 | 8/29/2012 | 8/29/2012 2:09:22 PM | A | FAIL |
|
|
Kolle after 9:00am Phone #: ###-####-need dbca on water supply and thermal expansion tank and a shut off valve on the cold feed to the water heater
|
MEC12-02999
| Rough-in | 8/28/2012 | 8/29/2012 | 8/29/2012 1:13:46 PM | A | PASS |
|
|
11 am duct blasting with Scott. Please confirm with him ###-#### >> Inspection requested via web by Stephanie Brown-20 lb gas test, duct blast and rough-in pass.
|
PLM12-01864
| Plumbing Rough-in | 8/28/2012 | 8/29/2012 | 8/29/2012 1:13:04 PM | P | PASS |
|
|
JOB # 12031. Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes
|
MEC12-03012
| Final | 8/28/2012 | 8/29/2012 | 8/29/2012 8:22:41 AM | A | FAIL |
|
|
Pressure test only, thanks! Phone #: ###-#### >> Inspection requested via web by April Thomas-pressure test fail
|
PLM12-01556
| Final | 8/28/2012 | 8/29/2012 | 8/29/2012 7:59:00 AM | A | PASS |
|
|
JOB # 12031. Phone #: ###-#### >> Inspection requested via web by Ann Marie Reyes
|