PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, August 29, 2012
.
Number of inspections:
17
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Forrest France
Title
FIRE INSPECTOR
Phone #
794-1981
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
FIR12-00451
INSP-Conference
8/28/2012
8/29/2012
9/5/2012 1:54:43 PM
A
DONE
On site conference with contractor regarding sprinkler coverage at exterior canopies to meet the guidelines and requirements of NFPA 13 2010 sections 8.15.7.1, 8.15.7.2, 8.15.7.3, and 8.15.7.5. Any alternate proposals or methods to these conditions must be approved by the fire code official per IFC 2009 104.9.
FIR12-00246
INSP-Sprinkler Rough-in
8/29/2012
8/29/2012
8/30/2012 3:03:22 PM
P
PART
Okay to cover pendent and SW heads above the sheetrock ceilings at the east wing resident rooms.
FIR11-00665
INSP-Final Inspection
8/29/2012
8/29/2012
8/29/2012 4:16:24 PM
A
PASS
FIR10-00622
INSP-Final Inspection
8/29/2012
8/29/2012
8/29/2012 4:15:23 PM
A
PASS
FIR12-00261
INSP-Final Inspection
8/29/2012
8/29/2012
8/29/2012 4:14:59 PM
A
PASS
FIR12-00466
INSP-Final Inspection
8/28/2012
8/29/2012
8/29/2012 3:33:53 PM
A
PASS
Fire sprinkler work passed final inspection.
BLD12-02067
FIRE-Final Inspection
8/29/2012
8/29/2012
8/29/2012 2:21:50 PM
P
PASS
Fire life safety inspection passed.
FIR12-00430
INSP-Final Inspection
8/29/2012
8/29/2012
8/29/2012 2:20:41 PM
P
PASS
Scope of work is finished. Fire sprinkler permit finaled.
FIR12-00264
INSP-Supply line flush
8/28/2012
8/29/2012
8/29/2012 2:19:22 PM
P
PART
UG fire supply line flush completed satisfactory.
FIR12-00451
INSP-Sprinkler Rough-in
8/28/2012
8/29/2012
8/29/2012 2:18:08 PM
A
PART
Overhead work at the second floor elevator machine room and four office rooms okayed for ceiling cover, also approved rough-in at the new 2" branch line and drops to the produce cooler and ceilings in the specialty area.
FIR12-00340
INSP-Final Inspection
8/28/2012
8/29/2012
8/29/2012 2:12:42 PM
A
PASS
Fire alarm permit finaled. Inspection passed.
FIR12-00458
INSP-Final Inspection
8/27/2012
8/29/2012
8/29/2012 2:10:39 PM
A
PASS
Fire alarm work passed test and inspection. Permit final approved.
BLD12-00812
FIRE-Final Inspection
8/28/2012
8/29/2012
8/29/2012 2:09:12 PM
A
PASS
Scope of work at the Jesse Tree office area passed life safety with the exception of hardware at the RR pocket door to be revised prior to structural final as discussed.
FIR12-00439
INSP-Final Inspection
8/28/2012
8/29/2012
8/29/2012 2:07:04 PM
A
PASS
Fire sprinkler permit finaled.
FIR06-00385
FIR-Aging Inspection
8/29/2012
8/29/2012
8/29/2012 11:00:47 AM
DEFR
FIR05-00238
FIR-Aging Inspection
8/29/2012
8/29/2012
8/29/2012 11:00:16 AM
DEFR
FIR07-00315
FIR-Aging Inspection
8/29/2012
8/29/2012
8/29/2012 10:59:48 AM
DEFR