ESC12-00793
| Site Preparation | 8/27/2012 | 8/27/2012 | | | |
|
|
|
BLD12-01635
| BLD-Foundation | 8/27/2012 | 8/29/2012 | 8/29/2012 3:52:34 PM | P | NR |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD12-02070
| BLD-Footing | 8/29/2012 | 8/29/2012 | 8/29/2012 3:25:02 PM | P | PASS |
|
|
Chris Phone #: ###-####
|
ESC12-00793
| Site Preparation | 8/29/2012 | 8/29/2012 | 8/29/2012 3:24:47 PM | P | PASS |
|
|
|
BLD12-01997
| BLD-Other | 8/28/2012 | 8/29/2012 | 8/29/2012 2:12:49 PM | P | CANC |
|
|
james Phone #: ###-####
|
ESC12-00763
| Random Inspection | 8/29/2012 | 8/29/2012 | 8/29/2012 2:11:53 PM | P | PASS |
|
|
|
BLD12-01997
| BLD-Foundation | 8/29/2012 | 8/29/2012 | 8/29/2012 2:11:22 PM | P | PASS |
|
|
james Phone #: ###-####
|
GCB12-00061
| GCB-Framing | 8/28/2012 | 8/29/2012 | 8/29/2012 12:43:03 PM | A | FAIL |
|
|
Kevin @ ###-####. Nail 2 ply girder as shown on truss engineering. Complete lateral bracing on A6,A7 and A8 trusses. More nailing is required on the portal frame. Nails at shear wall locations are overdriven, renail, areas that were stapled do not have correct spacing. Tempered glazing is required by doors in masterbedroom and dinning room. Correction notice was posted.
|
BLD12-01822
| BLD-Framing/Rough-in | 8/28/2012 | 8/29/2012 | 8/29/2012 11:42:20 AM | A | PART |
|
|
Eric Phone #: ###-####. Interior wood framed walls ok. Needs to add kickers to support walls.
|
BLD12-01824
| BLD-Framing/Rough-in | 8/28/2012 | 8/29/2012 | 8/29/2012 11:41:45 AM | A | PART |
|
|
Eric Phone #: ###-####. Interior wood framed walls ok. Needs to add kickers to support wall.
|
ESC12-00646
| Site Preparation | 8/29/2012 | 8/29/2012 | 8/29/2012 11:08:45 AM | A | PART |
|
|
Needs to post esc permit sign.
|
BLD12-01635
| BLD-Footing | 8/28/2012 | 8/29/2012 | 8/29/2012 11:08:04 AM | A | PART |
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|