Inspections for the day of: Thursday, August 29, 2013.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00438 INSP-Final Inspection8/29/20138/29/20138/30/2013 6:46:36 PMPPASS
Fire alarm testing completed, inspection passed. Permit finaled.
BLD13-01927 FIRE-Conference8/28/20138/29/20138/29/2013 5:20:42 PMPDONE
Conversation with tenant regarding items required for occupancy approval.
FIR13-00266 INSP-Sprinkler Rough-in/Hydro8/27/20138/29/20138/29/2013 5:08:10 PMPPART
Completed hydrostatic testing of the new dry system serving the south half of the parking garage.
FIR13-00268 INSP-Final Inspection8/28/20138/29/20138/29/2013 5:06:17 PMAPART
Items tested today include all MP stations, SD at the common, public and employee work areas on both the first and second floors, riser supervision, elevator recall and machine room functions, RA. Verified previous correction items are finished with the exception of a points map at the panel and ADA room coverage. Need to provide descriptors for all second floor initiating devices. Notification testing to be scheduled in advance as discussed with contractor and building manager on site.
BLD13-00925 FIRE-Final Inspection8/29/20138/29/20138/29/2013 2:12:50 PMPPASS
Life safety inspection passed.
BLD13-01218 FIRE-Final Inspection8/28/20138/29/20138/29/2013 2:11:54 PMAPASS
Fire life safety passed provided door hardware is installed as discussed and verified at structural final inspection.
BLD13-01927 FIRE-Final Inspection8/28/20138/29/20138/29/2013 12:00:00 AMPCANC
gordon Phone #: ###-####