FIR13-00438
| INSP-Final Inspection | 8/29/2013 | 8/29/2013 | 8/30/2013 6:46:36 PM | P | PASS |
|
|
Fire alarm testing completed, inspection passed. Permit finaled.
|
BLD13-01927
| FIRE-Conference | 8/28/2013 | 8/29/2013 | 8/29/2013 5:20:42 PM | P | DONE |
|
|
Conversation with tenant regarding items required for occupancy approval.
|
FIR13-00266
| INSP-Sprinkler Rough-in/Hydro | 8/27/2013 | 8/29/2013 | 8/29/2013 5:08:10 PM | P | PART |
|
|
Completed hydrostatic testing of the new dry system serving the south half of the parking garage.
|
FIR13-00268
| INSP-Final Inspection | 8/28/2013 | 8/29/2013 | 8/29/2013 5:06:17 PM | A | PART |
|
|
Items tested today include all MP stations, SD at the common, public and employee work areas on both the first and second floors, riser supervision, elevator recall and machine room functions, RA. Verified previous correction items are finished with the exception of a points map at the panel and ADA room coverage. Need to provide descriptors for all second floor initiating devices. Notification testing to be scheduled in advance as discussed with contractor and building manager on site.
|
BLD13-00925
| FIRE-Final Inspection | 8/29/2013 | 8/29/2013 | 8/29/2013 2:12:50 PM | P | PASS |
|
|
Life safety inspection passed.
|
BLD13-01218
| FIRE-Final Inspection | 8/28/2013 | 8/29/2013 | 8/29/2013 2:11:54 PM | A | PASS |
|
|
Fire life safety passed provided door hardware is installed as discussed and verified at structural final inspection.
|
BLD13-01927
| FIRE-Final Inspection | 8/28/2013 | 8/29/2013 | 8/29/2013 12:00:00 AM | P | CANC |
|
|
gordon Phone #: ###-####
|