FIR14-00555
| INSP-Sprinkler Rough-in/Hydro | 8/29/2014 | 8/29/2014 | 8/29/2014 3:01:37 PM | P | PASS |
|
|
Underground supply piping is ok to cover
|
FIR14-00566
| INSP-Final Inspection | 8/28/2014 | 8/29/2014 | 8/29/2014 3:00:18 PM | A | FAIL |
|
|
Ran out of smoke and lost connection with the computer to verify signals. To be rescheduled for tuesday morning.
|
FIR14-00248
| INSP-Final Inspection | 8/29/2014 | 8/29/2014 | 8/29/2014 2:19:41 PM | P | CANC |
|
|
Cancel per Tom Phone #: ###-####
|
FIR14-00357
| INSP-Sprinkler Rough-in | 8/29/2014 | 8/29/2014 | 8/29/2014 2:18:53 PM | P | PASS |
|
|
Rough-in passed. Piping can not be covered until a tenting inspection has been passed.
|
FIR14-00356
| INSP-Sprinkler Rough-in | 8/29/2014 | 8/29/2014 | 8/29/2014 2:18:01 PM | P | PASS |
|
|
Piping rough-in passed. Piping can not be covered until the tenting has been corrected.
|
FIR14-00356
| INSP-Sprinkler Rough-in/Hydro | 8/29/2014 | 8/29/2014 | 8/29/2014 2:17:21 PM | P | CANC |
|
|
Riser is not built yet so not ready for hydro test. Will be rescheduled.
|
BLD14-01713
| FIRE-Final Inspection | 8/29/2014 | 8/29/2014 | 8/29/2014 1:27:50 PM | P | PASS |
|
|
life safety passed
|
FIR14-00405
| INSP-Final Inspection | 8/28/2014 | 8/29/2014 | 8/29/2014 10:17:40 AM | A | FAIL |
|
|
Phone #: ###-####, I left message on contacts voice mail that I was on the way. Arrived at project, could not find contact and security guard knew nothing. No inspection performed.
|
BLD14-01743
| FIRE-Final Inspection | 8/28/2014 | 8/29/2014 | 8/29/2014 9:50:36 AM | A | FAIL |
|
|
Pendant head is overspaced . Work will require a permit. Life safety will be ok to final when completed.
|
FIR14-00581
| INSP-Sprinkler Rough-in | 8/28/2014 | 8/29/2014 | 8/29/2014 9:23:59 AM | A | PART |
|
|
Inspection turned into a conference. I noted, and we discussed, the extensive amount of obstructions caused by mechanical duct work. It does not appear that any of the obstruction rules for the CC heads can be met and that additional sprinkler heads will be required. With additional heads hydraulic calculations/pipe routing will/could be effected and plan modifications required. I also noted that the area under the stairs is combustible and does not have sprinkler protection. This will require special consideration to meet NFPA 13 requirements prior to a cover inspection.
|
BLD14-01764
| FIRE-Supply Line Cover | 8/28/2014 | 8/29/2014 | 8/29/2014 9:19:35 AM | A | CANC |
|
|
Wrong inspection type called in.
|
FIR14-00589
| INSP-Final Inspection | 8/28/2014 | 8/29/2014 | 8/29/2014 9:05:04 AM | A | CANC |
|
|
call 1/2 hour prior please...###-#### Phone #: ###-#### >> Inspection requested via web by Rick Groom Inspection cancelled from web by: Rick Groom
|